My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01707
DRMS
>
Back File Migration
>
Revision
>
REV01707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:16 AM
Creation date
11/21/2007 8:54:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980201
IBM Index Class Name
Revision
Doc Date
12/21/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:~ <br />COLORADO DIVISION OF XINERALS AND GEOLOGY <br />D02ER / RIPPER COST 8 PERFORMANCE DATA NORKSHEET <br />f <br />sheet 1 of 2 <br />Make 8 Model Cat D7G <br />Dozer Blade STRAIGHT <br />Attachment M1 ROPS Cab <br />Rear Ripper 3-shank ripper <br />Revision Date :April, 1995 (CRG date) <br />(Labor Rete date) <br />REFERENCES: 1) Lost Reference Guide (CRG) <br />2) Contractors Equipment Cost Guide (CECG) <br />3) Colorado Contractors Association (CCA) <br />Wage Rate Schedule <br />4) Caterpillar Perforniance HeMbook <br />BASE EDUIPMENT COSTS (CRG) <br /> ---------- Bese ONnership 8 Overhaul Costs -----------~ --------------- Base Operating Costs ------- -------- <br /> ONnership ~ Overhaul ~ Field Repair <br /> Depreciation LFC Overhead ~ Labor Perts~ Labor Parts ~ Fuel Lube Tirea G.E.C. <br />Machine (11.38 (6.21 (4.52 (2.76 (7.32 (3.41 55.91 (7.33 52.26 (0.00 (0.98 <br />Attachment R1 f0.00 (0.00 (0.00 (0.00 (0.00 50.00 50.00 (0.00 (0.00 (0.00 f0.00 <br />Rear Ripper (2.37 f0.80 (0.59 (0.31 f1.02 50.51 51.06 (0.00 50.22 f0.00 (0.88 <br />COST ADJUSTMENT FACTORS (CECG) <br /> ACOUI SITION COST BREAKDONN <br />Factor Description <br />__________________ Base Value <br />_______________ Adj. Value <br />______________ Multiplier <br />___________ ~ Cost Elements (CECG) <br />_____________----------- Factor <br />-___-___ Adj. Cost <br />_-------____ <br />Acquisition cost (242,973.00 (184,528.76 0.759 I <br />~ Base purchase price (242,973.00 <br />Econ. life hours 12,120 9,545 1.270 ~ Less dealer discount 0.085 f20, 652.71 <br />-attach. p1 11,000 11,000 1.000 ~ Plus freight 0.013 f3, 158.65 <br />Rear ripper 8,200 8,200 1.000 ~ Plus dealer charges• 0.005 51,214.87 <br />Annual use hours 2,112 1,395 1.514 ~ •MLRD estimate ----------- <br />Mech. labor cost (27.15 (23.32 0.859 ~ Adjusted purchase price f226,693.81 <br />Fuel S/gel. -gas (1.15 51.15 1.000 ~ Plus taxes: Sales B 3X (6,800.81 <br />-diesel (0.94 f0.94 1.000 ~ SNN g2% (4,533.88 <br />Luba cost (2.26 52.26 1.000 ~ Less Lire cost (0.00 <br />Tire life hours N/A N/A 1.000 ~ Less salvage value 0.236 553,499.74 <br />Tire factor N/A N/A 1.000 ~ ------------ <br />Tire cost N/A N/A 1.000 ~ Ne[ acquisition cost 5184,528.76 <br />ADJUSTED EOUI PMENT LOST! <br /> -------- Adjusted ONnership 8 Overhaul Costs ---------~------------- Adjusted Operating Costs ------ ------- <br />Acquisition cost f10.44 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A <br />Econ.life-Machine: 513.26 N/A N/A (3.50 (9.29 (4.33 f7.50 N/A N/A N/A N/A <br />-Rear ripper: N/A N/A N/A f0.39 (1.30 (0.65 E1.35 N/A N/A N/A X/A <br />Annual usage 515.81 510.61 57.74 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts 511.86 55.31 53.87 N/A N/A N/A N/A N/A N/A N/A X/A <br />Triple shifts f10.55 53.53 (2.58 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mech. lbr-Machine: N/A N/A N/A f3.01 N/A (3.72 N/A N/A N/A N/A N/A <br />-Rear Ripper: N/A N/A N/A (0.34 N/A 50.56 N/A N/A N/A N/A X/A <br />Fuel/lube-Machine: N/A N/A N/A N/A N/A N/A N/A (7.33 f2.26 (0.00 (0.98 <br />-Rear Ripper: N/A N/A N/A N/A N/A N/A N/A (0.00 (0.22 (0.00 (0.88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.