Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 006 <br />Date : 08/19/2002 <br />User: JRS <br />State :Colorado <br />County :Gunnison <br />Site :Bear No. 3 Mine <br />Permit/job # :C-81-033 <br />Abbreviation :none <br />Filename : C033-006 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 04 <br />Task description :Rip Portal Bench, Access Road and Facilities Area <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8SU Horsepower : 305 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.47 NA <br />Dozer operating cosUhour : $58.82 100 <br />Ripper operating cosUhour : $7.01 100 <br />OperatorcosUhour : $30.65 NA <br />Total unitcosVhour : $144.95 Totalfleetcost/hour: $144.95 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 8.64 acres Rip depth (ft) : 2.00 Volume : 27,878 BCY or CCY <br />Source of estimated quantity :Map 10 <br />Source of estimated load factor : NA ~ <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Facto rs - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production ', <br />Unadjusted production : NA cu. yds./hour per selected method : 2,494.65 cu. yds./hour <br />Area : Avg. ripping depth : 2.00 feeUpass Site altitude : 6,000 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feetpass Job efficiency factor : 0.83 (1 shiH/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass , <br />Production per unit area : 0.773 acres/hour Adjusted unit production : 2,070.56 cu. yds./hour <br />Unadjusted production : 2,494.65 cu. yds./hour Adjusted fleet production : 2,070.56 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 13.46 hours <br />Unit cost : $0.070 per cu. yd. Total job cost : $1,952 <br />