~ ~Sl E ~ ~{ F F ~ Y ~ yCf"d titF}~.P 6.. ~ 'Y is 4 { y~ ~A G 8 °} i~ `Z' :fi. ~i~ ,t y~:
<br />~~ °~-' ~TW
<br />TY
<br />I
<br />~
<br />C
<br />C
<br />M
<br />E
<br />-
<br />~~''
<br />~~`~~~~ ~'"~''
<br />EN
<br />M I
<br />,
<br />OAL-
<br />O
<br />PANY FOID CREEK MINE~
<br />L
<br />s
<br /> TECHNICAL REVISION TR05 48 =-
<br />;' , .. , ,: SUMMARYQF REVISIONS/ADDITIONS (04/05)„ , ,":
<br />REVISION/ADDITION DESCRIPTION PLACEMENT INSTRUCTIONS
<br />TABLE OF CONTENTS
<br />List of Exhibits List of Exhibits revised to Replaces List of Exhibits in
<br /> include Exhibits 60, 8X, 16E, Volumes I, and II through IIE
<br /> 16F, 25U, and 49A
<br />INFORMATION ON ENVIRONMENTAL RESOURCES ULE 2.04
<br />Pages 2.04-8, 8.1, 9, 503, Revised text addressing cultural Replace Pages 2.04-8, 9, 503,
<br />613, 61.4, 80.1, and 80.2 resource, AVF soils, and T&E 613, and 80.1 in Volume I
<br /> species investigations for the 6-
<br /> North Mains ro'ect area
<br />OPERATIONS PLAN -MINE FACILITIES ULE 2.05
<br />Pages 2.05-453, 45.4, 45.5, Revised operations and Replace Pages 2.05-453, 45.4,
<br />45.6, 45.6a, 45.6b, 45.6c, reclamation plan text describing 45.5, 45.6, 45.7, 84.2, 106, and
<br />45.6d, 45.7, 84.2, 106, 106.1, 6-North Mains facility 106.1 in Volume I
<br />and 106.2 development, operation, and
<br /> reclamation Tans
<br />TABLES
<br />Table 49A -Topsoil Stockpile Revised table including Replaces Table 49A in Volume
<br />Summary topsoil volumes for 6-North IVA
<br /> Mains facilit
<br />EXFIIBITS
<br />Exhibit 60, 6-North Mains New exhibit incorporating Insert after Exhibit 6N in Volume
<br />Intake Shaft -Supplemental cultural resource survey II
<br />Cultural Resource Inventory results for additional
<br /> disturbance areas
<br />Exhibit 8X, 6-North Mains New exhibit providing Insert after Exhibit 8W in
<br />Intake Shaft -Ditch, Culvert, drainage design information Volume II-B
<br />and Sedimentation Pond for 6NM Intake Shaft
<br />Desi
<br />Exhibit 16E, 6-North Mains New exhibit incorporating Insert after Exhibit 16D in
<br />Intake Shafr -Soils soils investigation maps for Volume II-B
<br />Investigation 6NM Intake Shafr (Maps
<br /> EX16E-M1 and M2
<br />Exhibit 16F, 6-North Mains New exhibit incorporating Insert after Exhibit 16E in
<br />Intake Shaft -Wetland wetland delineation maps for Volume II-B
<br />Delineation Report 6NM Intake Shaft (Maps
<br /> EX16F-Ml and M2
<br />Exhibit 25U, 6-North Mains New exhibit incorporating Insert after Exhibit 25T in
<br />Intake Shaft - GeotechnicaU geotechnicaUpavement Volume II-C
<br />Pavement Design designs for 6NM Intake Shaft
<br /> ad and road
<br />Exhibit 49A, 6-North Mains New exhibit, which includes Insert after Exhibit 48 in Volume
<br />Intake Shaft -Design Drawings design drawings for 6NM II-E
<br /> Intake Shaft (includes Figures
<br /> EX49A-F1 through F4, and
<br /> Maps EX49A-Ml, M2, and
<br /> M3
<br />MAPS
<br />Map 24, Surface Facilities and Revised map showing 6-North Replaces Map 24 (3 of 3) in
<br />Freshwater S stems (3 of 3) Mains Intake Shaft and Road Volume V-A
<br />
|