Laserfiche WebLink
<br /> <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, CO 80203 <br />Phone: 130J) 866-3567 <br />FAX:13031 a32~8106 <br />MINING PERMIT - COAL <br />Oermit Date: April 21, 1993 Permit No. C-81-021 <br />Permit Expiration Date: April 21, 1998 <br />OF'~~(O <br />RE P <br />~~ <br />~.~~ <br />~ ~8 T6 <br />Roy Rumer <br />Governor <br />Michael B. Long, <br />Divison Direnor <br />THIS PERMIT is issued by the Division of Minerals and Geology, Department of <br />Natural Resources, State of Colorado. <br />RECITALS <br />I. Walden Coal Company ("operator") desires to conduct a mining operation <br />known as the Bourg Strip Mine for the purpose of extracting coal. <br />II. On April 21, 1993, the Division of Minerals and Geology ("the Division") <br />approved the operator's application for this permit, fixed the amount of bond <br />and directed that this permit be issued upon the filing with the Division of <br />bond in the amount so fixed in form and substance approved by the Division, <br />and such bond has been so furnished. <br />III. On April 21, 1993, the Division made the following findings: <br />(a) The permit application is accurate and contains all information <br />required under C.R.S., 34-33-101 et Sec. and regulations promulgated <br />thereunder and that all the requirements of Article 33 of Title 34, C.R.S. <br />("such article") for the issue of a permit have been complied with; <br />(b> The applicant has demonstrated that reclamation as required by such <br />article can be accomplished under the reclamation plan contained in the permit <br />application; <br />(c) The assessment of the probable cumulative impact of all anticipated <br />mining in the area on the hydrologic balance specified in Section <br />34-33-110(2)(1) has been made by the Division and the proposed operation <br />thereof has been designed to prevent material damage to the hydrologic balance <br />outside the permit area; <br />(d> Granting the permit will not conflict with any designation decision <br />issued pursuant to Section 522 of the Federal "Surface Mining Control and <br />