Laserfiche WebLink
III IIIIIIIII IIII III r~flG <br />999 <br />STATE OF COLORADO <br />DIVISION OF MIN LRALS AND GEOLOGY <br />Department of Nutu ral Resources <br />I } 13 Shrn n,. r. 51., Ruum 21 i <br />Denver. CO 0G"'03 <br />Phone: (303! N66-3567 <br />FAX:1307101'_-8106 <br />March 11, 1993 <br />TO: Janet Binns ~ <br />:~ <br />FM: Shawn Smith-;•% <br />i -- <br />Re: North Thompson Creek Permit Renewal Review Assignments <br />(C-81-025) <br />Dear Janet: <br />:c a ° <br />L <br />1816 <br />Roy Romer <br />Governor <br />Michael 8. Long <br />Division D~reaor <br />I know how overloaded you are at the moment, but the North Thompson <br />Creek Mine permit renewal has arrived and is due to be farmed out <br />by me to the specialists. <br />Larry and I have suggested the following sections for your review. <br />Sections 2.04.9 Soils Resource Information <br />2.04.10 Vegetation Information <br />2.05.3 (5) Topsoil (removal and storage) <br />2.05.4 Reclamation Plan (working with me) <br />2.05.4(2)(d) Topsoil- redistribution (work with Erica) <br />The attached copy is for your use in the review. <br />Thanks. Review is due by mid-April since my PAR letter must go out <br />April 1, 1993. You can get even with me on Roadside. <br />