My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01583
DRMS
>
Back File Migration
>
Revision
>
REV01583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:10 AM
Creation date
11/21/2007 8:53:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
11/27/1998
Doc Name
TR-41 PN C-81-019 SEDIMENT POND REMODEL ADDITIONAL INFORMATION IN RESPONSE TO DMG LETTER 06/01/1998
From
DMG
To
COLOWYO COAL CO LP
Type & Sequence
TR41
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iuiiiiiiiiiiu <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Si., Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) ri68 3567 <br />FAY: (303) 832-8106 <br />November 27, 1998 <br />Juan Garcia <br />Sr. Mining Engineer <br />Colowyo Coal Company L.P. <br />5731 State Highway 13 <br />Meeker, Colorado 81641 ~ ~~ _ t~z ~~ <br />Re: Technical Revision 41 (TR-41), Permit C-81-019 Sediment Pond Remodel, Additional <br />Information in Response to DMG Letter Da[ed June 1, 1998 <br />References: <br />~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lochhead <br />E~ecu~iee Direarrr <br />nl~enaei e. luny <br />Dieisinn DireUar <br />is ~~ <br />I) Colowyo Coal Company L.P. (Colowyo) letter of November 18, 1998, subject as above <br />2) Colorado Division of Minerals and Geology letter of June 12, 1998, Re: Technical Revision <br />41 (TR-41), Permit C-81-019 Sediment Pond Remodel, Additional Information <br />Dear Mr. Garcia: <br />Thank you for your letter of November 18, 1998, subject as above. A few comments follow <br />regarding your responses under reference 1). <br />Item 1. See Item 5, reference 2 , d lines 40 and 41 of page 4.05-6, 11.18.98, TR-41. The <br />Division will accept page 4.0~ as written. However, the sentence as reads "Pumping of pit <br />water will not occur during the ] 0-year/24-hour storm events." is more restrictive than necessary. <br />Colowyo may well want to pump during such events. The intent of Item 5 of reference 2 was to <br />address Rule 4.05.6(4). To permit Colowyo more options in operation, and to recognize the <br />restrictions of Rule 4.05.6(4), I suggest rewording of this sentence to read as follows. "Pit <br />pumping rates will be controlled so that there will be no out-flow over emergency spillways from <br />the combined flows of pit pumping and up to 10-year, 24-hour stoma events." <br />
The URL can be used to link to this page
Your browser does not support the video tag.