My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01534
DRMS
>
Back File Migration
>
Revision
>
REV01534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:07 AM
Creation date
11/21/2007 8:53:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Revision
Doc Date
1/31/1996
Doc Name
SENECA II MINE PN C-80-005 PROPOSED DECISION MR 47 REVISED TOPSOIL BALANCE AND OWNERSHIP
From
DMG
To
SENECA COAL CO
Type & Sequence
TR30
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ • • III II IIIIIIII <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DcNarlmcnl nl N,vural R°soun es <br />I 117 Shcrm,m SI ,Rouen ! I S ~~~b~ <br />Ucnvci. (.ulu~ddu 1111!11 i II <br />Phone: U031866~3567 <br />FA%:0031 H32-8106 <br />DEPARTMENT OF <br />NATURAL <br />January 31, 1996 RESOURCES <br /> Roy Romer <br />Michael G. Altavilla, P.E. cOYef"°` <br />Engineering Manager WmesS lochhead <br />E.ecunve Dvecmr <br />Seneca Coal Company Michael g. Long <br />P.O. Drawer D D~,~s~onDnevl°, <br />Hayden, CO 81639 <br />Re: Seneca II Mine (Permit No. C-80-005) <br />Proposed Decision -Minor Revision No. 47 <br />Revised Topsoil Balance and Ownership <br />Dear Mr. Altavilla: <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision Form for Minor <br />Revision No. 47 at the Seneca 1[ Mine. As we discussed on the phone this morning, the Division <br />proposes to partially approve this revision. Upon review of the revision application, the Division <br />determined that the update to the topsoil balance would result in a significant alteration to the <br />reclamation plan by reducing the proposed amount of topsoil replacement thickness. The <br />Division proposes to approve the portions of the revision that pertain to the update of surface and <br />mineral rights (Tab 3). Please withdraw the portion of this revision relating to the topsoil <br />balance/topsoil replacement reduction and resubmit the topsoil information as a technical <br />revision. <br />Documentation must be submitted to the Division demonstrating that a copy of the revision <br />application and any subsequent modifications were sent to the appropriate federal agencies. The <br />project may not proceed until all copies have been sent. <br />If you have any questions, please contact me. <br />Sincerely, <br />r <br />Janet .. B~ ~ ^~, ~ <br />viro ental P otection Specialist <br />JHB/bjw <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.