My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01524
DRMS
>
Back File Migration
>
Revision
>
REV01524
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:07 AM
Creation date
11/21/2007 8:53:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Revision
Doc Date
7/11/1986
Doc Name
Preliminary Adequacy Letter -with written notes
From
MLRD
To
Colordao Yampa Coal Company
Type & Sequence
PR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ' ~ ~ ~~. <br />`~~;., <br />` J Q,,`_ <br />3. ~ The applicant should commit to annual submittal of post-mine ~'•~'; ;,i <br />topographic mapping and appropriate cross sections to allow for ~" v <br />comparison of approved and achieved topography. <br />4. The proposed rill and gully stabilization plan should be revised to be <br />din line with the Eckman Park approved plan. Specifically, the plan <br />should commit to regrading rills and gullies deeper than 9", (in <br />addition to furrow and diversion installation, etc,) except for <br />designated permanent gully locations. <br />The discussion ort page 2,05-49 relating to permanent gullies should <br />also be revised. Major reclaimed drainages in the Little Middle Creek <br />Tract may be appropriate locations for constructed channels and <br />gullying deeper than 9" might be "natural". However, documentation of <br />the pre-mine condition of these drainages with respect to erosion will <br />need to be provided if permanent gully approval is requested. Proposed <br />permanent gully locations should be delineated on a post-mine <br />topographic map and a channel construction and maintenance plan <br />patterned after that approved for Eckman Park would need to be <br />submitted. <br />The application indicates that four of the five previously sampled <br />gully sites lie within the Little Middle Creek Tract. However, based <br />on Map M-3 from the Eckman Park Rill and Gully Plan, only Site 5 is <br />within the proposed affected area. A narrative description of the <br />erosional condition of the Site 5 drainage should be provided (if <br />permanent gully status is requested for the reclaimed drainage in that <br />location). If permanent gully status is to be requested for additional <br />reclaimed drainages, characterization of the erosional condition of the <br />affected drainages should be provided. <br />5. V Wording on page 2,05-8 should be modified slightly to comply with <br />Rule 4,14.1(c) which states that rough backfilling and grading shall be <br />completed within 180 days of coal removal, <br />/dlm <br />2083E <br />1 ~' ~ ^, <br />` J ;.,s <br />. ~: <br />(~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.