Laserfiche WebLink
• <br />• <br />Site <br />PRS-1 <br />PRS-2 <br />PRS-3 <br />MDNE-1 <br />MDGE-1 <br />CCS-1 <br />CCS-2 <br />ACF-1** <br />SCF-1** <br />PAW-1 <br />PAW-2 <br />PAW-5 <br />PAW-6 <br />Backfilled <br />Channel AW <br />(East) <br />Backfilled <br />Channel AW <br />(West) <br />RDA Pond <br />Effluent <br />ACAW-1** <br />CCAW-1 <br />K~ <br />TABLE 1 <br />HYDROLOGY MONITORING REQUIREMENTS <br />NEW ELK AND GOLDEN EAGLE MINES <br />Revised Stipulation No. 12 - New Elk Mine <br />and Stipulation No. 10 - Golden Eagle Mine <br />August, 1985 <br />Water Level <br />or Flow <br />M <br />M <br />M <br />M <br />M <br />M <br />M <br />C <br />C <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Field <br />Measurement <br />M <br />M <br />M <br />M <br />M <br />M <br />M <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Short <br />List* <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />Discharge <br />List* <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />C = continuously <br />M = monthly <br />Q = quarterly (Februar May, August, November) <br />A = annually (November <br />A <br />A <br />A <br />A <br />A <br />* See attached table for parameters included in each suite. <br />** Not required until further disturbance as per revised Stipulation No. 14 <br />3081E/cj <br />• <br />