My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01470
DRMS
>
Back File Migration
>
Revision
>
REV01470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:04 AM
Creation date
11/21/2007 8:52:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
11/23/1993
Doc Name
MARR STRIP MINE C-80-006 MINE ACCESS & TIPPLE ROADS RECLAMATION COST ESTIMATE
From
DMG
To
RANDY PRICE
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br /> <br />Deparlmenl of Natural Resources ~ <br />R~pP ~ R <br /> b <br />~ <br />% <br /> <br />1313 Sherman 51 . Roorn ? 15 N <br />' <br />o <br />w (~ <br />~~~YYY <br />Denver, CO 80203 ~ <br />i <br />Phone 003) R66 3567 ~ ~B1b ~ <br />FAX: 1303) R}2-8106 <br /> Ray Romer <br /> Governor <br /> Michael 8. Long <br /> Division Diregor <br />DATE: November 23, 1993 <br />TO: Randy Price <br />FROM: Susan Burgmaier <br />RE: Marr Strip Mine (C-80-006) <br />A4ine Access and Tipple Roads <br />Reclamation Cost Estimate <br />I have reviewed the cost estimate provided by the operator for the above mentioned <br />reclamation tasks. I attempted to verify those costs, but have been unable to do so. The cost <br />estimate provided by the operator was based on the assumption that road surface material <br />would be disposed of in Pit 1. After discussing this with you, it became apparent that the <br />roads will be reclaimed approximately ten years after the pit areas. It would not be likely, <br />then, that the pit area would be redisturbed at a later date to facilitate disposal of road <br />material. The operator should either revise the reclamation plan to include an alternate <br />disposal location for the road base material, or revise the project schedule so that reclamation <br />of the roads and pit areas coincide. The reclamation cost estimate for the roads should be <br />adjusted accordingly. <br />If you or the operator have questions or need additional information, please let me know. <br />c: David A. Berry <br />SLn\ 112393. WP <br />~\~ <br />l ,\ .~ alt <br />
The URL can be used to link to this page
Your browser does not support the video tag.