My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01412
DRMS
>
Back File Migration
>
Revision
>
REV01412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:01 AM
Creation date
11/21/2007 8:52:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
Revision
Doc Date
1/12/2005
Doc Name
Review letter to OSM (E-mail)
From
Tom Kaldenbach
To
OSM
Type & Sequence
MR53
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assumed values for Chimney <br />Rock (inchesl: <br />Particle Existing <br /> Riprap base of <br />size channel <br />Des 5 1 <br />DSO 12 6 <br />Des 15 12 <br />Ratios recommended by Calculated Fitter <br />Corps of Engineers and ratio using needed? <br />Bureau of Reclamation assumed <br />values YeslNo <br />D,S riprap/D85 base<5 0.3 No <br />5<D,S ripraplD,S base<40 5.0 No <br />DSO riprap/DSO base<40 2.0 No <br />Protection at hydraulic transitions -Using the flow velocity of 5.5 fps from the <br />SEDCAD run in the submittal, the Froude number of a riprapped channel would be <br />calculated as SSft per sec./(32.2 fdsecz)(1 fl. flow depth) = 0.17. This value is less than <br />4, indicating violent hydraulic jumps will not occur at channel exits; therefore, additional <br />protection will not be needed at these locations. <br />Minimization of re-disturbance -The design specifies small tracked equipment for <br />transporting rock riprap with a minimum of trips and hand placing the riprap. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.