Laserfiche WebLink
1 <br />1 46 <br /> <br /> 1 The disposal area has six components <br /> 2 that I want to touch briefly on. The first <br /> 3 component is the tailings delivery and distribution <br /> 4 s <br />stem <br />That is a lin <br />the <br />mi <br />ill <br />f <br /> y <br />. <br />e co <br />rom <br />H <br />ng <br /> 5 facilities and it will be connected to a spigot line <br /> 6 that runs around the entire perimeter of the <br />' 7 tailings disposal area. <br /> 8 In the initial stages there will be two <br />' 9 disposal areas and the spigotting will be done <br /> l0 slightly differently. That's because you are at the <br /> 11 b <br />t <br />' <br /> o <br />tom of the valley. You don <br />t have as long a <br /> 12 beach slope to work with, so you have to 3o things a <br /> 13 little bit differently. <br />' 14 Eventually, the center berm will be <br /> 15 covered with tailings and there will be one large <br />t 16 tailings facility. The tailings area, as I <br /> 17 indicated before, is lined. It's lined with a <br /> 18 composite liner system consisting of a compacted <br />t 19 subsoil, compacted to 10 to the minus 5 centimeters <br /> 20 per second permeability and a 40 mill very low <br />' 21 density polyethylene synthetic liner. <br /> 22 In addition, as you place the tailings, <br /> <br /> 23 the tailings will also consolidate and compact. And <br /> 24 the testing that we have run on the tailings <br /> 25 indicates that the tailings are expected to compact <br /> <br /> AGREN, BLANDO 6 BILLINGS <br /> <br />