Laserfiche WebLink
1 <br />' 37 <br />' 1 occurred. <br /> 2 The first change was to move this waste <br /> 3 rock disposal area, waste rock disposal Area A, to <br />' 4 this point. It's located on the south side of <br /> 5 Rito Seco Creek now and is located further away from <br />' 6 the Rito Seco Cre <br />us a <br />k tha <br />th <br />o <br />d <br />i <br /> ppr <br />e <br />n <br />e prev <br />o <br />ve <br />' 7 permit. <br /> 8 Now, 1 just want to make note that these <br />' 9 maps are of two different scales, so don't think <br /> 10 that the sizes have been downscaled. It's just a <br /> 11 difference in the scale and the maps. <br /> 12 The second change in the waste drop <br />' di <br />i <br /> 13 sposal, Area B of the approved perm <br />t, that <br /> 14 disposal area was downsized somewhat and you will <br /> 15 see it here. Basically, we just took out the <br />t 16 western portion of the waste rock disposal area. <br /> 17 The south waste rock disposal area was a <br />' 18 c <br />mbi <br />tio <br />wa <br />te r <br />ck di <br />al <br />d t <br />ili <br /> o <br />na <br />n <br />s <br />o <br />spos <br />an <br />ngs <br />a <br />' 19 disposal area. Since we were going to build a <br /> 20 tailings disposal facility in place of the heap <br /> 21 leach, we no longer need the capacity in i:hat south <br /> 22 waste rock area to include the waste rock tailings, <br />' 23 so the south waste rock disposal area was <br /> 24 essentially downsized to include only waste rock in <br />' <br /> 25 that disposal area. <br /> <br />AGREN, BLANDO & BILLINGS <br /> <br />