My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-11-15_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-11-15_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 12:51:06 PM
Creation date
11/21/2007 8:52:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
11/15/1990
Doc Name
REPORTERS TRANSCRIPT OF PUBLIC HEARING VOLUME I APPLICATION OF BATTLE MTN RESOURCES INC IN COSTILLA
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />35 <br />' <br /> 1 circuit going through a carbon in leach process very <br />t 2 similar to what is being proposed in the amendment. <br /> 3 The tailings from that mill were to be <br />' 4 mixed with waste rock and disposed in the south <br /> 5 waste rock disposal area. The site was to be <br /> 6 reclaimed to its approximate preexisting condition <br />t 7 as range land for wildlife and grazing. <br /> 8 Some of the work completed to date on <br />' 9 the project includes a lot of reclamation last <br /> 10 summer on drill sites and drilling activ:.ties that <br />' 11 h <br />d <br />th <br />it <br />th <br />l <br />t <br />l <br /> ave occurre <br />e over <br />as <br />severa <br />on <br />e s <br />e <br />' 12 years that Battle Mountain has been investigating <br /> 13 the property. <br /> 14 Battle Mountain has also constructed <br /> 15 access roads, they have constructed suppcrt <br />' 16 facilities, including the office shop warehouse and <br /> 17 laboratory. They are in the process of that <br /> 18 construction right now. <br />' 19 They have not constructed any of the <br /> 20 mill facility nor have they done any work in the <br />' 21 heap leach area, and they have not done a.~y mining <br /> 22 on the project. <br />1 3 i <br />d <br /> 2 The perm <br />t amen <br />ment that we +are <br /> 24 addressing today was submitted on October 10, 1989. <br /> 25 The amendment addresses a change in the <br /> <br /> AGREN, BLANDO ~ BILLINGS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.