Laserfiche WebLink
Bowie Resources Limited <br />PR-07 Reclamation Estimate <br />A. Earthwork - Backfilling <br />1 Backfill B Seam Portal Bench <br />2 Excess Material returned to B Seam Portal Bench <br />3 Regrade to AOC <br />D. Earthwork -Fill Compaction <br />4 Compact placed material in B Seam Portal Bench <br />I. Earthwork -Drainage Control System Installation/Removal <br />5 Remove Culverts <br />J. Earthwork -Topsoil/Subsoil Replacement 8 Special Handling <br />6 Distribure Topsoil on restored slope of B Seam Portal <br />7 Distribute Topsoil on regraded Haulroad <br />K. Portal/Shaft Sealing <br />8 Seal 3 B Seam Portal Entries <br />M. Revegetation and Reseeding <br />9 Revegetation of B Seam Portal Area <br />10 Revegetation of Haul Road <br />N. Structural Demolition <br />11 Demolish all B Seam Structures <br />Total additional reclamation expense for PR-07 <br />Cost <br />30,311 <br />97, 344 <br />386 <br />11,440 <br />5,202 <br />11,859 <br />821 <br />27,437 <br />9,106 <br />926 <br />21,509 <br />216,341 <br />