Technical Revision No. 79 -PAR Responses <br />Apri118, 1997 <br />Page 6 <br />23. Locally available sandstone within the West Elk Mine site will be utilized for the rock drain. <br />The primary source will be from numerous boulders and cobbles within the RPE site. A <br />secondary source of rock is the lazge rock fall neaz MB-5. The rock will be of sufficient <br />durability as is demonstrated by its historic performance in numerous ditches at the mine, <br />which have been in place for over ten years. Sizing wil] be performed by the contractor <br />using hydraulic breakers and screening equipment, with field verification of suitable material <br />and gradations conducted by MCC construction management personnel. <br />24. The bottom of the RPE will be lined with PVC. <br />25. Figure L-1 has been revised to show that the bottom and down gradient side of the sand <br />drain will be fined with 30-m1 PVC. The liner will be utilized in the sand drains outside the <br />limits of Phase IA-iD construction. <br />26. Figure L-1 has been revised to include a 12 ounce per square yazd of non-woven geotextile <br />felt above the finer. This geotextile will also be placed below the liner in the rock drains. <br />27. The Division is correct in their observation that refuse pile leachate and water from seeps <br />and springs will comingle in the rock drains and sedimentation pond, and would be <br />discharged together with stortnwater runoff to the North Fork of the Gunnison River. The <br />Division has raised numerous issues in question 27, and MCC would like to respond to each <br />issue individually as follows: <br />In paragraph two the Division raises a concern that undiluted seep effluent and refuse <br />leachate will be discharged to the North Fork. This will not occw. Water from the rock <br />drain flows into the pond as shown on the Rock Drain Inlet Tower Detail on Figure L-3. It <br />will then mix with stormwater in the pond. Water from the rock drain cannot be directly <br />discharged through the outlet. The hydrologic calculations presented in Appendix L shows <br />a maximum seep leachate flow of 40 gallons per minute. At this design flow rate, the two <br />cell pond (9.09 AF capacity) has approximately 51 days of storage, without stormwater <br />inflow. MCC believes that a flow rate of 40 gpm is extremely conservative, and will <br />unlikely occur. However, it is reasonable to expect that maximum seepage would only <br />occur in response to storm events thus providing adequate dilution for any leachate <br />produced. In addition, MCC is expected to discharge water which meets effluent limitations <br />established in our NPDES permit. MCC is very aware of water quality issues and is <br />committed to complying the NPDES permit. <br />In the third paragraph the Division raises the issue of potential saturation of the waste refuse <br />if the rock drains were to backup due to their capacity being exceeded or being plugged. As <br />previously stated, MCC has created a drain sizing table to ensure the drains can handle 200 <br />percent of observed or design flows. In addition, Figure L-1 has been revised to include <br />liner material under and around the sand drains. MCC believes that because the springs are <br />within the RPE footprint rather than outside the footprint, the best engineering solution is to <br />carry this water to the rock drain rather than to cover the springs with a liner and risk <br />