Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESSIMAT ING FOAM - BULLD02ER NORH <br />Task p: 52c Prep. by: SLB cask File Name: 0007 -52c <br />Date: OB/14/97 Permit #:C-80-007 Mine: West Elk Mine <br />Permit Action: Minor Revision No. 220 <br />Task Description: Push west fill material to base of cut slope <br />HOURLY EQUIPMENT COST <br />_••••__-_-•_-_•••___- Basic Machine: Cat DBN Horsepower : 289 <br /> Blade Type: SEMI-UNIVERSAL ""-"""" <br /> Attachment #1: ROPS Cab Shift Has i s: 1/day <br /> Attachment p2: N/A --"""'-" <br />Cost Breakdown: <br />"""""""' Utilization } <br />Ovne rahip cost/hr - 540.09 N/A <br />Opeca Ling i overhaul tosc/hr- dozer $51.67 100 <br /> -ripper - $0.00 N/A <br />Operator cost/hr $22.99 N/A <br />Total egpc. unit cost/hr - $114.67 Total fleet oosc/hr : 5114.67 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 13,000.0 HCY Factor: 1.330 Volume: 17,290 .0 LCY <br />Source of quantity take-off: Operator ea timate <br />Source of est. swell factor: Division estimate, BOt rock-BOk dirt <br />HOURLY PRODUCTION <br />................. Job Condition Correction Factors <br />Avg. push distance: 900 ft. """ "'"'""'""'"" " ""'"""" "" <br />" """"" Operator.......... 0. 75 (avg.) <br />Unadjusted hourly Mac. consistency.. 1. 20 ICat tbll <br />dozer production: 252 LCY/hr Dozing method..... 1. 00 (gen.l <br />" " "'"' Vis ihilicy........ 1. 00 (av9.1 <br />Material consistency: Job eEfSciency.... O. BO (lah/dayl <br />Loose stockpile Spoil pile factor. 0. 90 Issd-fc) <br />"""""""""""-"'"" """""'"'-" Push gradient..... 1. 00 ICat tb1) <br />Avg, push gradient: 0.00 } (post Altitude derat ion. 1. 00 (Cat [bl) <br />" " ""'"" Material weight... 0. 79 (Cat tbll <br />Avg. Bite alt icude: 6400 ft. Blade type........ 1. 00 IS, SU, UI <br />Material weight 2900.00 16/LCY Nec Tab Correction 0. 53 <br />Mat. Descr.: " """""' """-'"-" "" <br />Decomposed rock - 90t Rock, BOt Earth Adjusted Unit Prod. : 134. 21 LCY/ht <br /> Adjus ted Fleet Production : 174. 21 LCY/hr <br />JOB COST """""" " <br />__•• Fleet size 1 Dozer(sl Total Sob Time : 12 B. B2 Hours <br />Unit Coec $0.854 /LCY Total Job Cost : 519,771. 55 <br />