Laserfiche WebLink
RECLAMATION COST SUMMARY conG'd <br />TOTAL DIRECT RECLAMATION COSTS (subtota l9 A through P): 57,944,360 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD fi PROFIT <br />Item p~ Item Description ~ Cos[ (51 <br />1. ~ Public Liability Insurance..... 1.590k of directs 5123,138 <br />2. ~ Contractor's Pecform.ance Bond.. 0.976k of directs 577,458 <br />3. ~ Cont raccor's Profit............ 10.00k of direct 5799,936 <br />9. ~ Job Superintendent.. ~ 5193,699 <br /> Subtot al (A): 51,188, 68C <br />TOTAL CONSTRUCTION CONTRACT AMOUNT Idi recC plus 0 L P1: $9.133,090 <br />B. DMG PROJECT' ADMINISTRATION EXPENSES <br />Item k~ <br />______ Item Description <br />____________________________________ <br />_______ ~ <br />_________ Cost (5) <br />-._________ <br />1. ~ Project engineering fees at.... 9.28k I <br />of cntr. ~ 5386,159 <br />2. ~ Staff admin. expense 1.004 of cntr. ~ 591,]]0 <br />Subtotal (B): 5979,485 <br />i07AL INDIRECT RECLAMATION COSTS (subtotals A through B): 51,668,169 <br />NET INDIRECT COST PERCENTAGE: 21.003 <br />TOTAL PERFORMANCE ROND AMOUNT (DIRECT plus INDIRECT costs): 59,612,525 <br />III. BOND STATUS -- BOND RELEASE SUMMARY <br />sheet 10 of 10 <br />