My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-03-18_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1987-03-18_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 6:42:21 PM
Creation date
11/21/2007 8:51:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
3/18/1987
Doc Name
Adequacy Response-Dust control plan
From
AMAX
To
Colorado Mined Land Reclamation Division
Type & Sequence
TR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'~ ~..iy ~~ AMAX Minaret Heso~ Company <br />' 1707 Cale Boulevard <br />Golden, C080407J293 - - _ _ <br />303 2349020 II I I II I II I II IIII III <br />999 <br />® MiAM+E~ / ~ ~ ~/ <br />March 19, 1987 Q / <br />CERTIFIED MAIL P-424-752-092 ~~~/~G`/ u~~~~~`~S'~ <br />Mr. David A. Berry ,,~ E C E I V E D <br />Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building MAR 1 8t9871/~ <br />1313 Sherman Street <br />Denver, Colorado 80203 MINED LAND <br />I°t f RECLAMA710N DIVISION <br />Re: Climax Mine File No. M-77-493. <br />Dust Control Plan - Response <br />Dear Mr. Berry: <br />The following is a point by point response to your letter <br />dated February 25, 1987. <br />Since Climax personnel have been utilizing Coherex <br />over the past 12 years, applications generally have <br />been made two (2) times per year based on drying <br />patterns of the tails (page 4 of the Plan). <br />Application scheduling, by necessity and common sense, <br />must be based on snowmelt conditions (as opposed to <br />general snow cover) and drying patterns. <br />Unfortunately, these conditions are not as predictable <br />as one might think. Applications must follow complete <br />drying for safe equipment access and efficient use of <br />Coherex. The drying process actually usually begins <br />in June, but may occur as early as May or as late as <br />July. Flexibility is the key to an efficient program. <br />For the 11 years prior to 1986, Climax has had little <br />problem and no complaints with its program. <br />Those areas that dry first with the highest potential <br />for blowing dust will be first to receive Coherex <br />applications. As per the Plan, Climax has planned for <br />a minimum of two applications at the rate described <br />therein. Applications generally will occur following <br />the initial drying period after snowmelt and again in <br />late summer/early fall (September) depending on <br />weather conditions. A wet summer may preclude the <br />necessity for a late summer application or, for that <br />matter, for a second application anywhere. Likewise, <br />a very dry summer could require more than two <br />applications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.