My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01294
DRMS
>
Back File Migration
>
Revision
>
REV01294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:54 AM
Creation date
11/21/2007 8:51:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
7/26/2002
Doc Name
Adequacy Review
From
DMG
To
Colowyo Coal Company
Type & Sequence
TR56
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 26, 2002 <br />Page 2 of 2 Pages <br />topographic high immediately north of the West Pit Ditch, and reducing the steepness of <br />the south side of the West Pit Ditch and the gradient of the bottom of the valley. <br />Item 2. Please add to the submission a revised Drawing 20 and other revised portions of the <br />Permit Application Package (PAP) generated by the proposed revisions to postmining <br />Topography. <br />Item 3. Another issue is a demonstration of volume calculations (past and current) that support <br />the proposal to revise the approved postmining topography. Please provide a general <br />recapitulation of your volume calculafions, and any adjustments to swell factors, as they <br />relate to specific proposed adjustments in the planned postmining topography. <br />Item 4. Schedules for reclamation activities were discussed during the meeting on July 24, 2002, <br />some of which would be relief from, or variance to, requirements for contemporaneous <br />reclamation. Please clearly describe schedules to accomplish delayed reclamation in any or <br />various portions of the disturbed areas in revised pages to the PAP. <br />Item 5. Revised postmining topography would also change the way spoil is handled, and may <br />have an impact on the bonding scenazio. Please provide revised reclamation cost estimates <br />(for bonding purposes) as may be incurred due to changes in mining and reclamation <br />(revised pages to the PAP). <br />Item 6. Another concern is the time limitations on phases of this technical revision. Please <br />request an appropriate time extension for the proposed decision on this technical revision. <br />The extension should provide the Division 10 at least days for review of your response to this <br />letter. <br />Thank you again for the work you have accomplished with regard to this technical revision. <br />Please call me if you have any questions. <br />Yours truly, <br />~ ~ ..~~~- <br />Byr n6 G. Waiker <br />Envirorunental Protection Specialist <br />Cc: Moffat County Clerk, Moffat County Court House, 221 West Victory Way, Craig, CO <br />81625 (for public file) <br />Steve Hinkemeyer, P.E., Manager, Technical Services, Colowyo Coal Company L.P., <br />5731 State Highway 13, Meeker, Colorado 81641 <br />Kimberley Wolf, Colowyo Coal Company L.P., 5731 State Highway 13, Meeker, <br />Colorado 81641 <br />Files: C-81-019 TR 56 (electronic), C:\WPDOCS\Colowyo\tr56adgitr2.19.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.