My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01282
DRMS
>
Back File Migration
>
Revision
>
REV01282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:53 AM
Creation date
11/21/2007 8:51:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
5/24/1985
Doc Name
MT GUNNISON NO 1 MINE PERMIT C-80-007 -UPPER WASTE PILE PERMIT REVISION
From
MLRD
To
SUE MOWRY
Type & Sequence
PR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />Further, the waste disposal pile will be constructed with granular <br />underdrains, designed to prevent saturation or invasion of water into the <br />waste pile. These five underdrains have been appropriately sized to ensure <br />that the pile will not become saturated. <br />West Elk Coal Company proposes to monitor both the ground water saturation <br />beneath and within the pile, in order to ensure that the pile remains dry. <br />The operator also agreed to install several survey monuments to monitor slope <br />stability of the completed structure and adjoining areas. <br />The original permit includes a statement of intended possible secondary mining <br />of coal beneath the coal pile. In order to assure the assumptions made in <br />completing the stability analysis are correct, the Division believes it <br />appropriate to impose the following stipulation upon approval of this permit <br />revision. <br />Stipulation No. <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY, PRIOR TO ANY DISTURBANCE AT THE <br />WASTE PILE SITE, TO SUBMIT AN APPROPRIATE AMENDMENT TO THE OPERATION PLAN <br />WITHIN THE EXISTING PERMIT TO LIMIT EXTRACTION BENEATH THE WASTE PILE TO <br />PRIMARY DEVELOPMENT ONLY. NO SECONDARY EXTRACTION SHALL BE ALLOWED BENEATH <br />THE PILE OR THE IMMEDIATELY ADJOINING AREA. <br />During the past several years slope instability has occurred in the surficial <br />deposits above the portals of the Mt. Gunnison No. 1 Mine. The area effected <br />lies downslope from the toe of the proposed pile. Because of this evidence of <br />surficial instability adjoining the proposed pile area, the Division desires <br />additional surface monument at ion and stability monitoring. For this reason, <br />the Division believes it appropriate to impose the following stipulation upon <br />approval of the permit revision application. <br />Stipulation No. <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY, PRIOR TO ANY DISTURBANCE AT THE <br />UPPER WASTE SITE, TO INSTALL SEVERAL ELECTRONIC TILT METER TUBES DOWNSLOPE <br />FROM THE TOE OF THE PROPOSED WASTE STRUCTURE. WITHIN 30 DAYS FOLLOWING <br />APPROVAL OF PERMIT REVISION APPLICATION, WEST ELK COAL COMPANY SHALL SUBMIT TO <br />THE DIVISION A PLAN FOR THE INSTALLATION OF THE TILT METER FACILITIES. THESE <br />TILT METER INSTALLATIONS SHALL OCCUR IN THE VICINITY OF MONUMENTS S1 AND S2, <br />AS INDICATED ON DRAWING N0. MG-R C-001, INCLUDED IN THE PERMIT REVISION <br />APPLICATION. DURING THE INSTALLATION OF THESE TILT METER TUBES, THE OPERATOR <br />SHALL AUGER AND LOG THE SURFICIAL AND BEDROCK STATIGRAPHY ENCOUNTERED. <br />AUGERING SHALL CONTINUE UNTIL THE OPERATOR HAS ESTABLISHED INTACT BEDROCK <br />OCCURRENCE. IF ANY EVIDENCE OF EXISTING LANDSLIDE DEPOSITS IS ENCOUNTERED, <br />THE OPERATOR SHALL DEFINE THE NATURE AND EXTENT OF THE PRE-EXISTING SLOPE <br />INSTABILITY. IF SUCH LANDSLIDE ACTIVITY IS DISCERNED, THE OPERATOR WILL BE <br />REQUIRED TO APPROPRIATELY RECONFIGURE THE PILE DESIGN, PRIOR TO INITIATION OF <br />ANY CONSTRUCTION ACTIVITY. <br />
The URL can be used to link to this page
Your browser does not support the video tag.