My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-03-30_REVISION - M1978056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978056
>
2006-03-30_REVISION - M1978056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:22 PM
Creation date
11/21/2007 8:51:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Revision
Doc Date
3/30/2006
Doc Name
Flood Control Mitigation Plan Extension Request
From
DMG tas
To
Varra Companies
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MRR-30-06 01:27 PM VRRRR COMPANIES 970 353 4047 P. 02 <br />Mar 30 06 O1rOlp VRRRR CDMPRt]IES 3036866743 <br />RNR"30-06 IZ:49 PR VRRRR CORPpN rES 470 383 X097 <br />Varna Gompt3rlies, Inc. <br />P. 01 <br />p. 1 <br />U1Q.91~clI~t;L F~~+eE CD edlG telenAanef10116fiG~GS?. F~ 1]e7166661U <br />Tbur~doy 30 Morph 24g6 <br />Tltornas A. 5chnincr <br />Environmental Protectivrr 3pecialis~ <br />Colorado Division of Minerals and Geoingy <br />gCCice ofMined Land Reclamation <br />13 i 3 Shcrnratl Street, Room 215 <br />Denver, Calarada 80203 <br />Subject: DMG Permit M197&-045 -Durham Sand 8t Gravrl Pit Cl4ss: ~eu"iSi on <br />Technics{ Revision 2 ~ e-Seq• ; T a <br />~>itt;n9ion ReQusst. D <br />Dear Tam: <br />Consistent with your eonversatioa with Chris Pauley, Vmra Companies, Inc. is <br />requesting an exlcosion of the deeisivR dale from 31 Much 2001± to 31 May 20t1G. <br />Varna Companies. Inc. rs attempting to reply m all of the concerns expressed by the <br />Divisioa in its carrespopdcna of 21 February 2UUli, and will nerd additional tirue <br />!o coulplcte the following actions or information: <br />Stability Analysis: Our civil engineer has contacted several firms to bid sad <br />perform drilling, core lab work and analysis. CGRS will commeacc drilling to <br />approximately twn weeks and shoald have analysis near the end of April We are <br />uncertain hou~ the results may impact final design, but i! is not anlidpatcd based <br />upon preliminary determinations myde ty CGtiS <br />Dcsi6n Hngineenng end the U.S. Atnry Corps of L•ngineer approval. Before the <br />U.S. Aimy Corps of L•nrineers oan approve the plans, th0y tnuet sisal be Halsted <br />by the engineer and submitted. Fiaal plans are atilt befog drawn up by Anderson <br />Consuling Engineers, and discussed with oar civil engineer Once Submitted, <br />Anderson Consulting Engineers arnicipates U.S. Amty Corps oCEngineers <br />approval could take up w three weeks. We anticipate that submittal to ucctu nv <br />later than the end of April. <br />Costs tviQ be determined ona the final plans arc drawn up. If final plans are <br />available by me end of April, there shuuW be little dilZiculty ui completing 1lrese <br />
The URL can be used to link to this page
Your browser does not support the video tag.