Laserfiche WebLink
r -- <br />j— D EC N SUMP NO �6 <br />% • \ `\ \� <br />\ \ <br />\ \ <br />t� . - �\\ •\ \ \ ' \ \S \ \\ ``` Y +L- N 49,500 <br />T1N� LbSC'P \LINK H US <br />IN \•v'v IS. ``\ \ \,\ `•,\\ `, '\ �\ Nor. <br />L AK \` E <br />p <br />`\ 49,250 r <br />UNDERDRAIN SUMP <br />ACCESS ROAD <br />1 <br />PHASE II TOE BERM [ALAN VIEW <br />Scale in Feet <br />0 30 60 120 N0 7TH <br />1" - 60 feet - <br />EXISTING PHASE II <br />TOE BERM CREST <br />EL. 9305.0 --.e <br />A <br />EL. 93 <br />12' MIN. <br />STRUCTURAL FILLD1 <br />V <br />it <br />3' MIN. SELECT STRUCTURAL FILL <br />(EXISTING) <br />PHASE II TOE BERM <br />STRUCTURAL FILL -� <br />2 3' MIN. <br />g OVERLAP <br />Al 1. CONTRACTOR WILL CONSTRUCT THE CREST ELEVATION OF THE PHASE II TOE BERM <br />AT ELEV. 9312, PRIOR TO ANCHOR TRENCH CONSTRUCTION. <br />00, 2. COMPACT SOIL LINER FILL OR OTHER FILL APPROVED BY ENGINEER TO BACKFILL <br />am Qry GEOSYNTHETICS ANCHOR TRENCH. <br />Permit Number #: —yn,/ 9 D -a5�V 3. 2' MIN. DRAIN COVER FILL NOT SHOWN. <br />Class: OPennit <br />SectExhibit <br />r._._._._._._._._._._._._ ._._._-- ._._._._._._._._._._._, <br />Class. evisi /-� p 4 _ PHASE If TOE IaEI�C� RAISE DETAIL <br />TypefSe ° - -- 1C�Q - ----------- - - - - -' r-� <br />Class: p Repon ro OGe l \ 9 / - NOT TO SCALE <br />Doc Type <br />DAppl. 08ontl ❑Enforoe Q Inspect <br />ENGINEER'S STAMP <br />IF THE ABOVE BAR DOES <br />NOT SCALE 1 INCH THE <br />DRAVING SCALE IS ALTERED <br />NO. I REVISION DESCRIPTION TM_ S_ DRAWING tS NOT APPROVED <br />REVISED ISSUED FOR CONSTRUCTION <br />ISSUED FOR CONSTRUCTION <br />ISSUED FOR FINAL DESIGN <br />NOTE: <br />1, TOPOGRAPHY PROVIDED BY WESTERN STATES <br />SURVEYING, INC. IS BASED ON TOP OF SOIL <br />LINER FILL AS -BUILT FOR THE PHASE I AND 11 <br />AREAS, AND FEBRUARY 1998 SURVEY FOR OTriER <br />AREAS SHOWN. CURRENT TOPOGRAPHY IN PHASE II <br />PSSA WILL .VARY FROM THAT SHOWN HERE, AND <br />CONTRACTOR TO CONFIRM MOST CURRENT ORE <br />TOPOGRAPHY. <br />2. LOW VOLUME SOLUTION COLLECTION RISER PIPE <br />LAYOUT COMPILED FROM 1996 AS -BUILT DRAWINGS <br />SURVEYED BY WESTERN STATES SUVEYING INC. <br />3. CONTRACTOR TO RELOCATE PIEZOMETER READOUT <br />BOX FROM EXISTING AREA TO RELOCATED LVSC <br />PUMP HOUSE. <br />4. CONTRACTOR TO RELOCATE EXISTING LVSC PUMP <br />HOUSE TO MATCH NEW TOE BERM CREST ELEVATION <br />AND END OF LVSC RISER PIPE LOCATION. <br />5. CONTRACTOR MAY BE REQUIRED TO RELOCATE <br />LEAK DETECTION SUMP NO. 3 DEPENDING UPON <br />LIMITS OF REGRADING. <br />80 MIL TEXTURED <br />(TEXTURE FACE DOWN) <br />LLDPE GEOMEMBRANE <br />PREPARED FOUNDATION -- <br />SURFACE FOR SOIL LINER FILL <br />WELD <br />0 <br />01 <br />L°_N <br />_ -_ - - -= - EXISTING GROUND CONTOURS (NOTE 1) <br />REGRADED`CONTOURS <br />LEAK DETECTION SUMP <br />- - -- APPROXIMATE FOOTPRINT OF <br />PHASE II TOE BERM RAISE <br />- - - - - -- EXISTING PHASE 11 LOW VOLUME r <br />SOLUTION COLLECTION RISER PIPES 1 <br />9330 <br />9320 <br />9310 <br />^9300 <br />Z 9290 <br />a9280 <br />J 9270 <br />w <br />�Ylk-rfl <br />9250 <br />9240 <br />0 <br />30 60 <br />11 111 111 111 !!I 111 Itl 111 I,I 111 I,I I,l 111 111 111 <br />I I I I I I I I I I I I I I I <br />III1111illlilllllll!! Ililllilllllliillf !Illillllill!III111 2' MIN. DRAIN <br />COVER FILL <br />I I I I I I I I I 1,1 I I I I i11 I I 1,1 I;I 1,1 I,I 1 1 <br />I,1 I,• I,I,I,,,I i I i,l,. I I,I,, I `,1,1,1,1,1 !,1 <br />SOIL LINER FILL <br />CSTRUCTURAL FILL <br />EXISTING 100 MIL SMOOTH <br />LLDPE UPPER GEOMEMBRANE <br />EXISTING 100 MIL TEXTURED <br />(TEXTURE FACE DOWN) <br />LLDPE LOWER GEOMEMBRANE <br />NOTE: <br />1) CONTRACTOR TO REFER TO PROJECT SPECIFICATIONS REGARDING MINIMUM <br />DRAIN COVER FILL DEPTHS FOR WORKING OVER GEOSYNTHETICS AND PIPING <br />WITH RUBBER TIRE AND TRACK MOUNTED EQUIPMENT. <br />PHASE If PSSA RAISE LINED DETAIL <br />1 <br />NOT TO SCALE <br />UNDERDRAIN SUMP <br />90 120 150 <br />HORIZONTAL DISTANCE (FT.) <br />01 <br />SECTION A —A' Fact <br />9 <br />0 30 60 120 <br />1" s 60 feet <br />180 210 240 <br />9330 <br />9320 <br />9310 <br />9300 <br />9290 Z <br />9280 a <br />9270 w <br />9260 w <br />9250 <br />9240 <br />i Illil;llllilfll t <br />I I I I 111 I l i l! I 1 1 1 1 1 1 1 1 1 1 1 1 <br />2' MIN. DRAIN <br />I I I I I.I I! I 1 111 i l l l l l l! 1 1 1 1 1 <br />II,Iilllls 111,111 1 111 fllll ill,llllllilli COVER FILL <br />/• �:).�a �: y�.i..-;;. ..j: /'i'�/ r�' /:;:�'!: LINER FILL OIL <br />\r '\ 7 <br />80 MIL TEXTURED /\��.�� HEAVY DUTY DIRECT BURIAL <br />(TEXTURE FACE DOWN) PIEZOMETER CABLE <br />LLDPE GEOMEMBRANE 14" DLk SDR 11 HDPE <br />LOW VOLUME SOLUTION <br />COLLECTION RISER PIPES <br />NOTES: <br />1) CONTRACTOR TO REFER TO PROJECT SPECIFICATIONS REGARDING MINIMUM <br />DRAIN COVER FILL DEPTHS FOR WORKING OVER GEOSYNTHETICS AND PIPING <br />WITH RUBBER TIRE AND TRACK MOUNTED EQUIPMENT. <br />LOW VOLUME SOLUTION <br />3 COLLECTION RISER PIPE DETAIL <br />9 1 NOT TO SCALE <br />12' MIN. <br />CREST WIDTH 1/2" DIA. HOLE <br />Q END CAP 2 EACH STAINLESS <br />STEEL HOSE CLAMPS <br />EL. 9312.0 / <br />EXISTING PHASE II `f STRUCTURAL FILL r / <br />TOE BERM CREST -� <br />EL. 9305.0 <br />5 <br />3' MIN. SELECT STRUCTURAL FILL <br />(EXISTING) <br />PHASE II TOE BERM <br />STRUCTURAL FILL -D <br />NOTES: <br />1. CONTRACTOR TO INSTALL 3 NEW METAL BOLLARDS (MIN. 4" DIA.) <br />EMBEDDED IN AND FILLED WITH CONCRETE AROUND <br />LOW VOLUME SOLUTION COLLECTION RISER PUMP HOUSE. <br />2. 2' MIN. DRAIN COVER FILL NOT SHOWN. <br />PHASE II LOW VOLUME SOLUTION RISER <br />NOT TO SCALE <br />PIPE DETAIL <br />EXTEND EXISTING 2 -14" DIA. SDR <br />11 <br />HOPE LOW VOLUME SOLUTION <br />COLLECTION RISER PIPES TO <br />MATCH NEW EDGE OF PAD <br />AND TOE BERM ELEVATION. <br />-80 MIL LLDPE <br />LINER BOOT <br />EXTRUSION WELD <br />EXISTING 100 <br />MIL SMOOTH <br />LLDPE UPPER <br />GEOMEMBRANE <br />EXISTING 100 <br />MIL TEXTURED <br />i..., (TEXTURE FACE DOWN) <br />LLDPE LOWER <br />GEOMEMBRANE <br />EXISTING TOP OF 14" DIA. SDR 11 <br />HOPE LOW VOLUME SOLUTION <br />COLLECTION RISER PIPES. <br />RECEIVED <br />MAR 1 9 1999 <br />DATE BY ICHKD AP'VD1 NO. REVISION DESCRIPTION TMS DRAWING IS NOT APPROVED DATE BY CHKD AP'VD <br />UNLESS LAST REVISION IS RAND WRITTEN �� Cripple Crook C. Victor Gold f <br />.�lna'tg C0111aQR�f <br />�T Cro>GCOro Project <br />CLIENT 'DA'L'E A Joint Venture - Piket Peak Mining Company, Manager <br />Q PRINT ISSUE RECORD 'TN'B <br />Irt'iAsE r] IlmddllllAlNldddllNll <br />DATE PHASE G Tic BERM RAW 19614 <br />Q DRAWN MRJ DATE JUNE, 1998 <br />x cUCnD TM 'OB ND. 983 -2348 <br />A MTV RZVMVU TM DIGITAL NO. D228 <br />AL- <br />APPROVED JMJ <br />11/13/98 TM TM JMJ LL �IJ Scaz AS SHOWN DWG <br />7/6/98 TM TM JMJ 200 UNION BLVD. SUITE 600, LARRkGOD,.coLGRADO 902x8 I��ME NO. 2348D228 <br />PRONE: SOS 980 —o5k0 1iAx: SOS 986 -2080 <br />M <br />