Laserfiche WebLink
1 <br />1 <br />' Slurco is requesting a complete Phase III final bond release on all disturbed areas for the remaining <br />amount of $100,606. The following sections provide information that Slurco believes justifies <br />Phase III release for the Phase I, II, III, and IV azeas of the Canadian Strip Mine. The discussion <br />' focuses on the ten-year minimum liability period, documentation of revegetation success criteria, <br />capability of reclaimed areas for post mining land use, and a surface and groundwater quantity and <br />quality impact analysis. General information required for the bond release is provided in Table <br />t 1 <br /> <br /> <br />1 <br />1 <br />1 <br />1 <br /> <br /> <br /> <br />1 <br />1 <br /> <br />1 <br />' 986ondp3.091 Vsugust 4, 1998 3 <br />