Laserfiche WebLink
1 <br />1 Appcndii A • 1998 & 1997 VeRetatian SamP(inR Data <br />' Table A-5 <br />Summary of Production Sampling <br />' Canadian Strip Mine - 1998 One Square Meter Quadrants <br />' 1998 Production Conversion Calculations <br />Phase I, II, & III, Phase )v Reclaimed Areas, and Big Sagebrush Reference Area <br />' (1.) Phase I, II,& III weighted sample mean (x) = 87.13 grams/1 m~ <br />The sample mean for production is converted to pounds per acre: 43.56 • 8.90309 = <br />' 775.76 pounds per acre. <br />-~_ <br />' (2.) Phase IV sample mean (x) = 90.98 grams/1 mZ <br />The sample mean for production is converted to pounds per acre: 90.98 • 8.90309 = <br />' 810.02 pounds per acre. <br />(3.) Big Sagebrush Reference Area sample mean (z) = 39.76 grams/1 mZ <br />' The sample mean for production is converted to pounds per acre: 39.76 • 8.90309 = <br />353.95 pounds per acre. <br />I~ <br /> <br /> <br />~I <br /> <br />1 <br />1 <br />1 <br />A-14 <br />