Laserfiche WebLink
The site will be revegetated using a mixture of graminoid and forb species. No shrub or <br />tree plantings are proposed as part of the final reclamation plan. <br />(v) Topsoiling -specify anticipated minimum depth or range of depths for those areas <br />where Topsoil will be replaced. <br />Topsoil will be uniformly placed and spread on all areas disturbed by the mining above the <br />anticipated high water line. The minimum thickness shall be 6 inches above the <br />surrounding finished grade. <br />E-470 Public Highway Authority -Henderson Development (Sandy Acres) - MLRB 112 Permit Amendment Application <br />Exhibit E - 5 <br />