Laserfiche WebLink
<br />• <br />4-71a New. A continuation of the information on 4-71. <br />4-71b New. Added a discussion of work required to <br />reclaim the area disturbed in May 1988, control- <br />ling and treating the No. 1 Mine seepage water. <br />This page also firms up the plan to use the top- <br />soil stockpiles, located along the truck dump haul <br />road, for reclamation at the mine site. <br />4-92 Revised. Included the $45,000 contingency, to the <br /> reclamation cost estimate for the UTL, for prime <br /> farm land restoration. <br />Drawing Revision <br />D-2-3 Revised. Made a minor revision to the permit <br /> boundary to include the feed lot area that was <br /> regraded with material which was removed from a <br /> nearby berm. This work wsa done at the request of <br /> the land owner and is discussed on page 4-96b of <br /> the permit. <br />D-2-5 Added. This drawing shows details of the No. 1 <br /> Mine Seepage Control and Treatment Pond Plan. In <br /> My N.O.V. abatement request transmittal dated June <br /> 9th, this drawing was incorreotly numbered D-2-4. <br />The bond amount will increase $44,300 as a result of this techni- <br />cal revision. The new bond amount can be summarized ae Pollows: <br />ITEM <br />Mine Site Reclamation <br />UTL Reclamation <br />Prime Farm Land Contingency <br />TOTALS <br />PRIOR AMOUNT <br />$527,500 <br />231,800 <br />45,000 <br />5804,300 <br />RBVISBD AMOUNT <br />5571,800 <br />276,800 <br />incl. above <br />$848,600 <br />A revised List Of Drawings for the table of contents is also in- <br />cluded with this transmittal. If you have any questions regard- <br />ing this request for a technical revision, please call. <br />Sincerely, <br />Jim Stover, P.E. <br />Chief Engineer <br /> <br />'.~ <br />