Laserfiche WebLink
<br /> <br />REMARKS: Kent -Map TR-94-18 reflects the recent change in the <br />proposed preparation plant location and is a component of <br />the related Twentymile Coal Company TR submittal. Map <br />24 reflects the addition of a small 8" culvert immediately <br />northeast of the compressor building. The drainage design <br />calculations address the noted 8" culvert and sizing for a <br />replacement culvert on Foidel Creek. We will be submitting <br />one additional map providing documentation for drainage <br />areas for the Foidel Creek culvert tomorrow as soon as <br />drafting and certification review ompleted. Please call <br />with any questions. <br />TerraMatrir /nr. • /47S I'irte Grove Road, Suire /09 • Srenmbont Spnnga', Cn(orado N0477" (303) 879-6260 <br />