Laserfiche WebLink
<br />GMCC has two areas of concern regarding the Livision's bond cal- <br />culation. The first is the rip rap channel cost. Since the No. <br />2 P7ine ~:as never developed the channel is only- out 1500 feet <br />long. At Sd.80 per ton delivered, the cost o 6!/(i ~- rds of rip o(' <br />rap is on 1.~- 5a,3`L0. Adding to this the cc= of eeotetitile <br />fabric, 51.(10 per square ~-ard, and rip rap placing at $2.OU per <br />}•a rd, brims the total cost of the rip rap to approximately' <br />58,000. The second item cf concern is structure removal. The <br />517,358 amount. shown on page 18 of '~5 of the Divisi.on's calcula- <br />tion sheets is not required since the portals have alread~• been <br />sealed. <br />Please let me know if we need to process another technical revi- <br />sion request. t.o incorporate these last. few changes into the per- <br />mit. <br />Sincerel5•, <br />.~«-~ ~~cevGv <br />Jim Stover, P.E. <br />Chief Engineer <br />