Laserfiche WebLink
' Kiser Creek or Rowell DraT,~. The historic data the mine has <br />on Ward Creek and Williams Creek is measured at a different <br />point than the data shown in the table. The data for Ward <br />Creek and Williams Creek shown in the table has been revised <br />to reflect the five rears of monitoring data collected b}- <br />cMCC. <br />Backfill and Grading - Rules 2.05.316), 2.05.3(91 <br />2.04.41211x), 2.05.4(2)Ic), 4.09, 4.13 and 4.14 <br />Q. Given the current size of the underground t:ast.e development <br />pile, will GMCC be able to meet. the post.-minim topograph}- <br />proposed in 2.05.4(211c1-1? <br />A. A revised post minim topograph}• map has <br />ti:o certified copies of it are included <br />t.al. Drawing # 2.05.41'l)4c)-1 & 'L shoe: <br />tion of the major drainage which will <br />site. Both of these drawings have been <br />changes in the topograph}• and are als <br />transmittal. <br />been prepared and <br />caith r.nis transmit- <br />s profile and sec- <br />cross the reclaimed <br />revised to rei'lect <br />~ included with this <br />Information for Bonding Evaluation <br />Q. How much overburden is available in the stockpile? <br />A. The old strip pit spoil area contains appro};imatel}' 36,600 <br />}-ards. The south end of the coal card and the road embank- <br />ment leading to it contain approsimatel)• 13,000 }•ards. <br />y 9 00 ~ <br />Q. What is the source of dirt fill for the shaft? <br />A. The shaft Twill be filled with dirt from the berm near the <br />shaft T.•hich provided the sound barr' The 6' diameter ti0' <br />deep shaft.T:ill only require abou 150 ~- rds of material to <br />fill it. ~.,~,yu, cry ~)CtMi..~ <br />Q. Which areas have a reclaimed slope greater than 3 to l? <br />a. None of the reclaimed areas are planned T;ith slcpes greater <br />than 3 to 1. <br />Q. Is the overburden required to fill the pond to be stockpiled <br />someT~•here near the Bate? <br />A. Material necessar}• for pond backfill is available in the <br />road embankment directly- north of the pond. This area is <br />noted as Borrow Area C on the final contour map. ' <br />9. How are the portals currently- sealed. JJ ~; <br />Ohl-,. ~''I~-~'~ . <br />A. Both portals are sealed T:ith two roTas of solid cinderblock. <br />Q. l,'hat is the source and t?•pe of rock T:hich Trill he used for <br />rip ran in the channel reconstruction. <br />