My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00963
DRMS
>
Back File Migration
>
Revision
>
REV00963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:36 AM
Creation date
11/21/2007 8:49:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/31/1997
Doc Name
Letter Enclosing Cost Information
From
DMG
To
COLOWYO COAL CO
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1713 Sherman St., Room 215 <br />Denver, Colorado 80207 <br />Phone: (707 866-7567 <br />FAxP'~.e2as, 1997 <br />To: Byron Walker <br />From: Janet Binns <br />Re: Reclama ion Ho etimating coats <br />Ur6~ <br />DEPARTMENT O <br />NATURAL <br />RESOURCE' <br />Roy Romer <br />Governor <br />lames S Lochhead <br />Ewecurive Director <br />Michael B Long <br />Division Director <br />The estimating costs we use for Profit, Contractor's Performance <br />Bond, Contractor liability insurance, and Engineering fees, for <br />reclamation Cost Estimates are based upon Means Site Work and <br />Landscape Cost Data. These rates are found in the 010 "Overhead" <br />section of Means. <br />Engineering Fees: See 010-028-0011 <br />The actual rate depends upon the size of the overall job. <br />I am including a semi-log graph that shows how we would <br />calculate the Engineering/Contract Prep. Fee. <br />Public Liability Insurance: See 010-040-0600 this is 1.550 <br />Performance Bonds: See 010-068-0011 and -0200 <br />We averaged these two to get 0.975%~ <br />Profit: We calculate on 10.000 of direct costs <br />We also include a cost for DMG Administration Expenses. which <br />includes the extra costs involved with DMG inspections. This is <br />calculated on an avg of $28.51/hr the hours calculated based upon <br />overall job hours. <br />We did allow for third shift work for Colowyo ONLY for backfilling <br />and Grading Large Earthmoving tasks. This would exclude any of the <br />more precise tasks like Topsoil replacement, Pond and ditch <br />removal. etc. <br />If you or Jim Kiger have additional questions, let me know. <br />
The URL can be used to link to this page
Your browser does not support the video tag.