Page 2 <br />June 8, 1994 <br />Pikeview Corr. Act. <br />Tom Schreiner <br />Item number 2 in your inspection report discusses some small cuts along a previous access <br />road that was never finished. This work has not been completed. Work is proceeding on <br />completing the stormwater management facilities (mainly doing the massive channel <br />excavation). This correction will be done as that work is completed. There is a great deal of <br />material being removed from the channel and some of that can easily be used to backfill these <br />cuts rather than hauling in additional material to do the backfilling. This seems to be a more <br />efficient approach to doing this work. Any sediment discharge produced by the erosion of the <br />cuts does not leave the old road bench. These cuts have been there for over 10 years and have <br />not caused any true environmental harm, but they do look bad. On a long term basis, the cuts <br />could expand uphill some distance before self repairing. Therefore, this backfilling is currently <br />cosmetic, but is also intended to eliminate the possibility of these cuts causing a problem 20 <br />years from now. This work will be completed using material derived from the channel <br />excavation. The backfilling should be completed by late June, but seeding will not occur until <br />this fall as it is too late to seed now. Prior to seeding, any surface hard pack will be loosened <br />so the backfill will accept the seed. <br />It is hoped that this slight delay in completing item 2 is not a problem. Please recognize the <br />minor nature of this item and be assured that it will be completed soon. In my opinion, when <br />everything else that Castle has done on this operation is considered, it is clear that they are <br />showing good faith in managing the site. <br />If you have any questions, please call. <br />Respectfully, <br />~~ ~ ~~~ <br />Mark A. Heffner <br />cc: Castle Concrete <br />vRVrcax.cm <br />