My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00851
DRMS
>
Back File Migration
>
Revision
>
REV00851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:30 AM
Creation date
11/21/2007 8:48:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/1/2005
Doc Name
Request for a Lease Modification For Federal Lease D-034365
From
Colowyo Coal Company L.P.
To
BLM
Type & Sequence
TR60
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coal Tonnage Calculation <br />The coal tonnage was based off our most recent model information (the model information was provided to the Craig BLM office on <br />7uly 5, 2005) which includes the drill hole data noted on Drawing No. I. The bum areas in these ridges are very unpredictable and <br />cannot be clearly delineated without intensive drilling. For example please see Drill Hole WP-Ol-02 on the Drawing No. 1. <br />Colowyo has taken their proposed extraction to the approximate center of the ridge line. The seams targeted for this lease <br />modification are the "D" and "E" Seams only. Note that while the "C" and "F" seams are shown on the crossection, because of <br />geologic conditions, they cannot be recovered by highwall mining, and are uneconomic by surface methods. <br />Coal Extraction Methodologies <br />With Colowyo's recent success with highwall mining, Colowyo is pursuing highwall mining targets in the adjacent areas of the <br />existing pits. This lease modification is one of those areas. Coal extraction would be a two phase operation for both seams. A <br />mining bench will be established bypre-stripping with the Truck\Shovel operation. This will occur along the east side of the <br />modification area. Following the pre-strip, the coal exposed will be removed by traditional surface mining techniques. The <br />remaining portion of each seam is then planned to be recovered by highwall mining. I[ should be noted that Colowyo's ability to <br />extract this coal will be based on geotechnical conditions that have yet to be determined. The highwall miner is capable of <br />extracting coal from the hortizontal depths up [0 1100 feet, which conforms to the area included in [his lease modification. The <br />highwall miner has sufficient technology to control and manage the extraction height and depth, including the depth in the portal to <br />within inches. The extraction of this coal will be planned in our mining sequence with the remainder of the West and East pits. <br />cr,,,o <br />
The URL can be used to link to this page
Your browser does not support the video tag.