My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00838
DRMS
>
Back File Migration
>
Revision
>
REV00838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:29 AM
Creation date
11/21/2007 8:48:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
5/25/2001
Doc Name
TR 20 FIFTEEN DE-GAS HOLES BOWIE 2 MINE PN C-96-083 BOWIE RESOURCES LIMITED
From
DMG
To
BOWIE RESOURCES LIMITED
Type & Sequence
TR20
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- • • <br />STATE OF II I I it l 11 l 11 fill lli <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of Nolural Resources <br />~F <br /> <br />1313 Sherman 51., Room 215 ' <br />D~•rn~er, Colorado 80?03 <br /> <br />Phone: 1303) 866-3567 <br />DIVISION OF <br />M I N E R A L ~- <br />FAX: 1303) 8328106 $c ~~ <br /> GEOLOGY' <br />~ <br /> ; <br />RECLAMATIOh <br />MINING•SAfETY"~ <br />May 25, 2001 <br /> Bill Owens <br /> Governor <br /> Greg E. Walther <br />Mr. William A. Bear Jr. Etec°~i°~ Direc~nr <br />Bowie Resources Limited hhchael B. Leng <br /> Division Director <br />P.O. Box 483 <br />Paonia, Colorado 81428 <br />RE: Technical Revision No. 20, Fifteen De-Gas Holes, Bowie No. 2 Mine, Permit No. C-96- <br />083, Bowie Resources Limited <br />Deaz Mr. Bear: <br />The Division has finished its review of the Bowie Resources Limited (BRL) submittal for <br />Technical Revision No. 20. The Division has the following questions or comments. <br />With the approval of Technical Revision No. 11, the Division accepted a generic well <br />completion diagram for the gob de-gas boreholes. However, since there will be many <br />such boreholes, the Division believes that individual well completion diagrams would be <br />more appropriate. Therefore, following installation of the gob de-gas boreholes, please <br />provide a well completion diagram for each of the boreholes. Well casing and perforated <br />well casing intervals should be included in the completion diagrams. In addition, any <br />aquifers or saturated zones encountered during drilling should be depicted on the <br />appropriate completion diagram. Finally, please provide individual well completion <br />diagrams for those gob de-gas wells that have already been drilled. <br />2. Please provide revised text that explains the difference between an upgraded road and a <br />refurbished road. <br />The reclamation estimate states that cement will be used to completely fill the gob de-gas <br />boreholes upon reclamation. However, the submittal cover letter states that cement or <br />other appropriate material will be used to seal the de-gas boreholes. Please clarify. The <br />Division's position is that cement, rather than cuttings, should be used top to bottom for <br />de-gas borehole sealing. <br />4. Please provide a discussion in Section 2.05.4(2)(8) of the permit application, found on <br />
The URL can be used to link to this page
Your browser does not support the video tag.