Laserfiche WebLink
Mazch 2000 -iv- 993-2099.150 <br />Drawing 28 Phase N VLF Reclamation Grading Plan <br />Drawing 29 Phase IV Construction Phasing Plan <br />Drawing 30 Phase N Underground Working Remediation Details <br />VOLUME VI <br />LIST OF APPENDICES <br />Appendix A Field Investigation <br />Appendix A-1 Phase N Test Pit Logs <br />Appendix A-2 Phase N Test Hole Logs <br />Appendix B Laboratory Testing <br />Appendix B-1 Phase N Material Property Testing <br />Appendix B-2 Liner Load Testing <br />Appendix B-2-1 Results of Liner Load Testing (1999) <br />Appendix B-2-2 Results of Liner Load Testing (2000) <br />Appendix B-3 Drain Cover Fill Permeability Testing <br />Appendix B-4 Cresson Ore Percolation and Consolidation Tests <br />Appendix B-4-1 Percolation Test Results (1999) <br />• Appendix B~-2 Percolation Test Results (2000) <br />Appendix B-5 Ore Shear Strength Test Data <br />Appendix B-5-1 1 ~fz Inch Minus Cresson Ore Shear Strength Test Results <br />(1996) <br />Appendix 8-5-2 3/a Inch Minus Cresson Ore Shear Strength Test Results <br />Appendix B-6 Interface Shear Strength Testing <br />Appendix B-6-1 Phase IV Interface Shear Strength Testing <br />Appendix B-6-2 Interface Shear Strength Testing for Phase I (Ironclad Borrow <br />Area 1493) (Originally Submitted as Part of Amendment Nos. <br />6 and 7) <br />Appendix B-6-3 Interface Shear Strength Testing for Phase II (Borrow Area <br />No. 5 1996a) (Originally Submitted as Part of Amendment <br />Nos. 6 and 7) <br />Appendix B-6~ Interface Shear Strength Testing for Phase III (Borrow Area <br />No. 2 1996b) (Originally Submitted as Part of Amendment <br />Nos. 6 and 7) <br />Appendix 8-6-5 Interface Shear Strength Testing for Borrow Area No. 2 <br />(1996c) (Originally Submitted as Part of Amendment Nos. 6 <br />and 7) <br />Appendix B-7 Cresson Ore Data <br />Appendix B-7-1 Cresson Ore Draindown Data <br />Appendix B-7-2 Cresson Ore Moisture Data <br />I:\99\2W9\FINAL REPoRT3099MAIN2.DOC Golder Associates <br />