My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00800
DRMS
>
Back File Migration
>
Revision
>
REV00800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:27 AM
Creation date
11/21/2007 8:48:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978279
IBM Index Class Name
Revision
Doc Date
4/24/1997
Doc Name
TRANSFER OF PERMIT AND SUCCESSION OF OPERATOR APPLICATION FORM
Type & Sequence
SO2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />;.. <br />e IIIIII'I~~IIIIIIIII • <br />RECErV~g <br />R24~ `~, <br />TRANSFER OF PERMIT AND SUCCESSION OF OPERATOFL.'F' ' <br />APPLICATION FORM UU siono~Minerals$~ <br />eo~ogy, <br />~. <br />The application for a Transfer O~ PerLit and Succession of Operators must contain <br />four (9) major parts: I) an Application Form; 2) and Application Fee; 3,) a <br />Performance Warranty (attached as part of the Application Package) bearing the <br />original notarized signature of the Successor operator; and, 9) a replacement <br />Financial Warranty provided by the Successor Operator, bearing an original notarized <br />signature. To expedite processing, please provide the information in the format and <br />order described below: <br />I. FINANCIAL WARRANTY INFORMATION (Choose ONE Option): <br />1. Option A: I wish to WAIVE MY RIGHT to a 30-day <br />(Initial ~ Date} processing time to allow the Division of <br />Minerals and Geology to recalculate the <br />Financial Warranty requirements. <br />1. Option B: / ~~ / <br />(Initial S Date) <br />I DO NOT WITH TO WAIVE MY RIGHT to a <br />30-day processing time. I hereby submit a <br />replacement financial warranty for the <br />same dollar amount as the financial <br />warranty maintained by the current <br />operator. I understand that the Division <br />of Minerals and Geology will recalculate <br />the required reclamation bond within 60- <br />days from the decision date and the <br />required FINANCIAL WARRANTY COULD BE <br />SUBSTANTIALLY INCREASED at that time. As <br />the operator, I agree to be responsible <br />for posting any required increase to the ' <br />financial warranty for good cause shown, <br />in a form acceptable to the Board, within ' <br />60-days of such notice. <br />q ~. ~~-~a-~7 <br />n~ou. NJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.