Laserfiche WebLink
CIRCES Cost Esttmatina Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Ageney or organization name:DMG <br />Task 8: 006 Slate : Coloratlo Permitlob 4: M-1980-193 <br />Date: 08!07/2002 County: El Paso Abbreviation:none <br />User JD1 Gite:SOko/Pi1 Filename: M193-006 <br />Parmil or otherjob action :Final Rxlamation <br />Task tlescription : MOb/demob equipment <br />EQUIPMENT TRANSPORT RIG COST Shia basis : 1 per day <br />Cost tlala source: CRG Dafa <br />Truck tractor Description :Generic on-highw2y truck tractor, 6x4, diesel pow¢req 400 HP <br />Truck trailer tlescription : Generc lolding gooseneck, drop deck equipment trailer (25T, 50T, and 90T) <br />NON-ROADABLE EOUIPMENi <br />Available rig capacities: 0-28 Tons 26-60 TOna 51. Tons <br />Ownership cosVhour: 524.34 526.99 533.09 <br />Operatin cgsvhour $28.49 $30.2] 534.34 <br />Operator cosMOUr. S2Z0] .52].0] $2Z0] <br />Helper cosMaur: $O. L10 523JB 32378 <br />Total Unit LOSMleOf: $]9.90 3108.11 $118.28 <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cgsdhr/unit Haul Rig <br />Cosuhr/unll Fleet Siza <br />(NO, units) Haul Trip <br />CasUhr/fleet ReWrn Trip <br />CosUhr/deal DOT permit <br />CosVtleet <br />-Ca10]R-]U 35.53 $41.04 5108.11 1 $149.15 510811 $0.00 <br />-CAT 950G Standard lik 19.53 $20.04 $]9.90 1 $99.94 $]9.90 50.00 <br />-Beetling equipment 10.00 $20.00 5]990 / $9990 5]9.90 50.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> I <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />$uMOtals: $348.99 526].91 $0.00 <br />ROADABLE. IP ENT <br />Machine <br />Description Total <br />CosMour/unp Fleet Slze <br />(No. units) Heul Trip <br />CosVhr/fleet Retum Trip <br />CosVhrflleet <br />-G¢nerk l2.18c, 6xd 569.42 2 $]38.84 $13886 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals. 5138.80 $138.84 <br />EQUIPMENT HAUL DISTAN CE dTIME <br /> Nearest major city or town within project area region: Colorado <br />7a hton Cvde T'me' Non- Total one-way travel tlistance: 300 miles <br /> Roatlable Roatlable Average travel speetl: 50.0 mph <br /> Epuipmenl EGUipmenl <br />Haul time (hours) = Q60 0.60 Total nomroedable mob/demob cast': $1,]8225 <br />Refum time(hours)= 0.60 0.60 'IVq rcum mps wnh haul rig <br />Loading time (hours) = O. J$ NA iINal roada5le moWdemob cost ^: 5166.61 <br />Unloading time (hours)= 075 NA "one mono mp, no lam ry <br />Subtotals= 270 L20 <br />JOB TIME AND COST Total job time: 5.40 hours <br /> Total job cost: $1,954 <br />