My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-08-02_REVISION - M1980193
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980193
>
2002-08-02_REVISION - M1980193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:41 PM
Creation date
11/21/2007 8:47:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980193
IBM Index Class Name
Revision
Doc Date
8/2/2002
Doc Name
SO Submittal
From
DMG
To
Virgil & Lorraine Mitchell
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 08/01/2002 <br />User: JO1 <br />Agency or organization name : DMG <br />Permit or other job action :Final Reclamation <br />cask description :Replace topsoil on outslopes <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R - 7U Horsepower : 230 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $35.19 NA <br />Operating cosUhour : $44.43 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosVhour : $30.65 NA <br />Total unit cosUhour : $110.27 Total fleet cosUhour : $110.27 <br />MATERIAL QUANTITIE <br />Initial Swell <br />volume : 7,575 CCY factor <br />Source of estimated volume : calcu/aNon <br />Source of estimated swell factor :program <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 666.7 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />TOp SOII <br />State :Colorado <br />County : F! Paso <br />Site :Sokol Pit <br />3.00 % (i <br />6.940 feet <br />1,600 Ibs/LCY <br />Loose <br />1.215 volume : 9,204 LCY <br />Job Condition Correction Factors <br />Operator skill :_ <br />Material consistency :_ <br />Dozing method :_ <br />Visibility :_ <br />Job efficiency :_ <br />Spoil pile :_ <br />Push gradient :_ <br />Altitude : <br />Material weight : <br />Blade type :_ <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />PermiUjob# : M-1980-193 <br />Abbreviation :none <br />Filename : MY93-002 <br />0.75 <br />1.10 <br />1.20 <br />1.00 <br />0.83 <br />1.00 <br />1.07 <br />0.95 <br />1.44 <br />1.00 <br />1.20 <br />Source <br />799.90 <br />799.90 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 11.51 Hours <br />Unit cost : $0.138 /LCY Total job cost : $1 269 <br />
The URL can be used to link to this page
Your browser does not support the video tag.