My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00727
DRMS
>
Back File Migration
>
Revision
>
REV00727
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:23 AM
Creation date
11/21/2007 8:47:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Revision
Doc Date
3/14/2001
Doc Name
APPLICATION FORM FOR A REVISION TO A COAL MINING & RECLAMATION PERMIT
Type & Sequence
MR15
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF MINERALS AND GEOLOGY <br />,~ r ,• 1313 Sherman Stre ,Room 215, Denver, Colorado 80203, (303) 866-3567 - <br />J IIIIIIIIIIIIIIIIIII <br />sss <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(731. <br />technical revisions, as defined in Rule 1.04(1361, and permit revisions, as defined in Rule 1.04(901. All <br />revisions are to address the requirements of Rule 2.08.4. Three (31 copies of the revision, including maps, <br />must be submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be <br />printed in the lower right corner of each revision page. A cover letter to the revision should explain the nature <br />of tha revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list (except OSM) at the same time the application is submitted to the Division, and proof of distribution must <br />be submitted to the Division along with the application. Copies of revision pages modified during the review <br />process must be distributed in the same manner, along with proof of distribution. Proof of distribution must <br />be submitted prior io implementation of the revision. <br />Permit No.: C - 81 - 025 Date: 03 / 12 / O1 <br />Permittee: MINREC, INC. <br />NORTH THOMPSON CREEK MINES RECEIVED <br />Street: 2768 COMPASS DRIVE. SUITE 101 MAR 1 '+ 291 <br />City: GRAND JUCTION <br />State: CO Zip Code: 81506 - <br />Oirision of Minerals and Geology <br />Brief Description of Revision: Incorporate Phase II and Phase III <br />Bond Release Reveaetation Success <br />Samplincx into permit, Appendix 3-X. <br />Public Notice Attached: Yes _ No xx (Required for PR's and TR's) <br />Bond Increase: Yes No xx Federal xx Non-Federal Mine <br />Proposed Change in: <br />Disturbed Area (+/-) _ _ 0 . 0 Acres Affected Area (+/-) _ _ 0 . 0 Acres <br />Permit Area (+/-) _ _ 0 . 0 Acres Federal Land (+/-) _ _ 0. 0 Acres <br />State Land (+/-) _ _ 0 . 0 Acres Private Land (+/-) _ _ 0 . 0 Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.