My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00722
DRMS
>
Back File Migration
>
Revision
>
REV00722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:23 AM
Creation date
11/21/2007 8:47:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
8/31/1993
Doc Name
DESERADO MINE PN C-81-018 PROPOSED DECISION TR 32 SDH 4 POND & ACCESS ROAD CULVERT
From
DMG
To
WESTERN FUELS UTAH
Type & Sequence
TR32
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 1 <br />Colorado Division of Minerals and Geology <br />RECLAMATION COST SUMMARY FORM <br />----------------------------- <br />----------------------------- <br />PERMIT NUMBER C-81-018 PREP. BY: JHB FILENAME: C018-OA <br />DATE 08-Sep-93 OPERATION:Deserado Mine <br />PERMIT ACTION Technical Revision No. 32 <br />I. DIRECT COSTS <br />------------------------------------------------------------------------ <br />RECLAMATION COST SUMMARY <br />A. EARTHWORK <br />Task No.; Task Description ; Cost ($) <br />9 ; Regrade SDH#4 Process Pond, diversion ditch, flow; $128 <br />cell ; <br />10 ; Redistribute topsoil on SDH#4 Process pond, flowc; $52 <br />Subtotal (A):--_---_$180- <br />8. DRILL HOLE/MONITORING WELL SEALING <br />Task No.; Task Description Cost ($) <br />~ ~ <br />SDH#4 sealed est. in TR-31 ; <br />~ ~ <br />Subtotal (8): <br />- -------- - <br />C. MISCELLANEOUS RECLAMATION TASKS <br />Task No.; Task Description ; Cost ($) <br />i <br />12 ; Structural Demolitio-remove 30" dia. x 20'1 CMP ; $116 <br />Revegetation ; $204 <br />Mobilization/Demobilization <br />Subtotal (C): $320 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through C): $500 <br />II. INDIRECT COSTS <br />------------------------------------------------------------------------ <br />A. CONTRACTOR'S OVERHEAD & PROFIT, CMLRD CONTRACT ADMIN_ EXPENSES <br />Item No.; Item Description ; Cost ($) <br />i <br />Sum ofi Indirect Percentages... 20.000% of dir. ; $100 <br />TOTAL INDIRECT RECLAMATION COSTS Subtotal (A): $100 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): $600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.