Laserfiche WebLink
<br /> <br />Exhibit L <br />Page 2 <br />RECLAMATION CUSTS <br />West Pond North, East 3c West Banks <br />Slope Grade - 1,200' x 40' <br />Place top soil 1,200' x 40' <br />Revegitation 1.1 acres <br />Cottonwood seedlings <br />Over Burden Pile Area <br />Slope grade - 600' x 150' & 700' x 100' <br />Place top soil -piles & sttn•ounding area - 5.~ acres <br />Revegitation - 5.5 acres <br />Haul Road &c Stockpile Area <br />24 hrs. !FQ $50/hr. _ $1,200 <br />32 hrs. (~ $50/fv. = 1,600 <br />1.1 acres ~ $138/a - 1_°2 <br />30 L $5.00/ea. = 1`_~0 <br />lG hrs. ,~ $50/hr = $ 800 <br />20 hrs. ~n $SOily. = 1,000 <br />5.5 acres ~ $138/acre=760 <br />Remove concrete not moved with conveyors 20 hrs. ~°? $50/hr = $1,000 <br />Grade existing gravel to establish proper drainage 36 hrs. (chi $50/hr. = 1,600 <br />No topsoil or revcgita[ion in this area <br />Total $8,252 <br />10 % State Overhead 826 <br />TOTAL THIS STAGE $90;98 <br />It is estimated that reclamation on this area will begin in 1998 and be completed by 2000. <br />