Laserfiche WebLink
III~~ <br />,.L <br />~ <br />~ <br />West Elk Coal Company, Inc. <br />/ Post Olfice Box 591 <br /> Somerset. Colorado 81434 <br /> Telephone 303 929 5015 <br />June 29, 1987 <br />999 <br />~tECE1VE® <br />JUL 21987 <br />MINED LAND <br />RECLAMATION DIVISION <br />Susan Mowry <br />Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, CO 80203 <br />-R = s3 <br />T~ ~/\`~ <br />Re: Technical Revision to Reduce Hydrology Monitoring <br />and Variance for Lower Refuse Pile Cover, Mt. <br />Gunnison No. 1 Mine, CMLRD Permit No. C-007-80 <br />Dear Susan: <br />West Elk Coal Company hereby requests an additional <br />30 day extension of the proposed decision deadline for the <br />above referenced technical revisions. The request <br />for extension of time is due to the complicated <br />nature of the two revisions. <br />If anything further is required at this time, please <br />call me. <br />Sincerely, <br />Dennis P. Conn <br />Director of Permitting and <br />Environmental Compliance <br />DPC/sds <br />cc: W. S. Wagener <br />AMCO 620 <br />