Laserfiche WebLink
<br />• <br />'~ Page two <br />August 5, 1987 <br /> <br />I've enclosed the bond calculations for the dismantling and disposal of <br />the materials. The substation itself will be the "portable" type and thus <br />will be easily transported by a truck and trailer. The concrete material <br />will be broken up and transported to an appropriate disposal site. Also, as <br />reflected by the bond calculations, the tanks will be utilized again. <br />As the total cost of the dismantling and removal of the materials <br />associated with the tipple operations is sma71 ($1050.00) relative to the <br />currently posted bond, CYCC feels additional bond money is not warranted. <br />The existing transformer next to County Road 27 will be removed and <br />refurbished. The remaining equipment is part of a switching station owned <br />and operated by Yampa Valley Electric Association and thus we have no <br />liabilities associated with the station. <br />If you have any questions or require additional information, please <br />feel free to call. <br />Sincerely, <br />Claire Semmer <br />Environmental Specialist <br />CES/de <br />Attachments <br /> <br />