My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-08-20_REVISION - M1981302
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981302
>
1997-08-20_REVISION - M1981302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 4:31:19 PM
Creation date
11/21/2007 8:46:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Revision
Doc Date
8/20/1997
Doc Name
TR-07 SOIL TESTING PLAN DEEPE PIT WESTERN MOBILE AMENDMENT 02 PN M-81-302
From
DMG
To
HART ENVIRONMENTAL
Type & Sequence
TR7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• III IIIIIIIIIIIIIIII ,E OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department ni Natural Resources <br /> I 1.1 Sherman 51., Koons 215 Pi <br /> Denver.Colorado 80203 <br /> Phonon e:(303)866-3567 <br /> FAX:1303)832 8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> August 20, 1997 RESOURCES <br /> Roy Romer <br /> Mr. Mike Hart Cuveroor <br /> James S.Lochhead <br /> Hart Environmental Execwrve Dneclor <br /> P. O. Box 1303 Michael B.Long <br /> Boulder, CO 80306 Division Director <br /> Re: TR-07 Soil Testing Plan - Deepe Pit - Western Mobile Amendment 02 <br /> Permit No. M-81-302 <br /> Dear Mr. Hart: <br /> The Division has reviewed the above-referenced TR submittal and has the following <br /> comments: <br /> 1) Reference is made in the submittal to replacing five to six inches of topsoil. The <br /> approved Amendment 02 - Stipulation 4.2 requires that a minimum of 5.5 inches <br /> of topsoil be replaced on all reclaimed lands within the permit area. <br /> 2) Topsoil sampling for N, P, K, EC, pH and organic matter content should be done <br /> after the topsoil is spread. The number of samples (one per five acres, one per <br /> ten acres) should be specified. <br /> 3) Topsoil depth should also be measured and the number of measurements <br /> specified. Each hole should be left open, flagged, and the Division should be <br /> noticed that the test holes are ready for inspection. <br /> If you have any questions, please contact me. <br /> Sincerely, <br /> ) ' <br /> Gregg R. Squire i <br /> Environmental Protection Specialist <br /> cc: Warren Keammerer <br /> David Plummer <br /> m.bssVmwgre991tr <br />
The URL can be used to link to this page
Your browser does not support the video tag.