Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanment of Natural Rewurces <br />1713 Sherman SI.. Room 215 <br />Denier. Colorado 80203 <br />r-,r.tell/ <br />Phone: [3071866.3567 St;l' <br />FAX: 130318)28106 APPLICATION FORM FOR A REVISION ~ g <br />TO A COAL MINING AND RECLAMATION PERMIT <br />DiviSi~i~ ~, ~ .. 9 arc ~ <br />This form must be completed and submitted with all requests for minor revisions, as defined in Roy Romer <br />Rule 7.041731, technical revisions, as defined in Rule 1.0411361, and permk revisions, as defined cO1""D` <br />in Rule 1.041901. All revisions are to address the requirements of Rule 2.08.4. Three (31 copies ume+5. Lochneatf <br />Eaecunve Director <br />of the revision, including maps, must be submitted in order for it to be complete. <br />Nucheel 8. Lone <br />Divitim Director <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised <br />sections, maps, tables and/or figures, with a revised table of contents, if necessary. The revision submittal <br />date should be printed in the lower right corner of each revision page. A cover letter to the revision should <br />explain the nature of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list at the same time the application is submitted to the Division, and proof of distribution must be submitted <br />to the Division along with the application. Copies of revision pages modified during the review process must <br />be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. For non-federal mines, a copy of the application for which the <br />Division has issued a proposed approval decision must be submitted to the OSM Western Regional <br />Coordinating Center (1999 Broadway Blvd., Suite 3320, Denver, CO 80202-57331, and proof of submittal <br />to OSM must be submitted to the Division prior to implementation of the revision. <br />Permit No.: C -~ 1 -~ 7 1 Date: 0 9/ 7 2 / 9 6 <br /> <br />Permittee: C O ~ O R ~_ D 0 _~ A 61 P~ <br /> C O A ~_ C O II P A P Y <br />Street: R O U T T _ C O U N ~ Y_ <br /> R O A D _ # 2 7 <br />City: O A I( _ C R A E ~______ <br />State: C O Zip Code: 8 0 4 6 7- <br />Brief Description of Revision: <br />Public Notice Attached: Yes <br />1994 MID-TERM REVIEW RESPONSE, TEXT <br />CONSOLIDATION <br />No X (Required for PRs and TRs) <br />Bond Increase: Yes No X <br />Proposed Change in: <br />Disturbed Area (+/-) <br />Permit Area (+l-) _ <br />0 <br />0 <br />Federal X Non-Federal _ Mine <br />~ Acres Affected Area (+/_) _ _ 0 0 Acres <br />~ Acres Federal Land (+/_) _ _ 0 0 Acres <br />State Land (+/_) _ _ 0 0 Acres <br />Private Land (+/_) _ _ ~ ~ Acres <br />m •lcoallsha relforns18866 <br />