My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00496
DRMS
>
Back File Migration
>
Revision
>
REV00496
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:10 AM
Creation date
11/21/2007 8:46:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/10/2005
Doc Name
Supplemental Liner Load Testing
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
TR45
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
zoos -s- <br />5.0 RESULTS AND CONCLUSIONS <br />Os3-2386 <br />Upon completion of the liner load test periods (24 hours minimum), the test samples were <br />disassembled and the liner materials were visually inspected and vacuum tested for damage. <br />5.1 Test #1-Phases III and )v OSA Liner System <br />The 80-mil textured LLDPE geomembrane liner had minor indentations and scratches, but did not <br />show any signs of failure or puncture. After visual inspection, the liner material was vacuum tested <br />for pinhole leaks resulting from the loading. A vacuum pressure of 70 mm Hg was applied. The finer <br />passed the vacuum tests, indicating the absence of pinholes in the liner. <br />This liner load test demonstrate that minimum thickness 80-mil LLDPE textured geomembrane liner <br />can withstand ore loads to an equivalent height of approximately 1,110 feet (850 psi, assuming an are <br />density of 110 pcf), without puncture. This liner system is representative of the Ore Storage Area <br />(OSA) liner system which was approved and constructed within Phases III and N of the Cresson <br />VLF. <br />5.2 Test #2 - Phase IV PSSA Liner System <br />The 100-mil smooth LLDPE geomembrane liner did not show any signs of failure or puncture. After <br />visual inspection, the liner material was vacuum tested for pinhole leaks resulting from the loading. <br />A vacuum pressure of 70 mm Hg was applied. The liner passed the vacuum tests, indicating the <br />absence of pinholes in the liner. <br />This liner load test demonstrate that minimum thickness 100-mil LLDPE smooth geomembrane liner <br />can withstand ore loads to an equivalent height of approximately 820 feet (630 psi, assuming an ore <br />density of 110 pcf), without puncture. This liner system is representative of the Pregnant Solution <br />Storage Area (PSSA) liner system which was approved and constructed within Phase N of the <br />Cresson VLF. <br />i:\OS\23850400VN-Iimdoadsupp0505\05323Bfi 0400.fiilrep.doc Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.