Laserfiche WebLink
CIRCES Cost Estimatino Sotlware <br />EQUIPMENT MOBILIZATION I DEMOBILIZATION <br />Agency or arganira[ian name :DMG <br />Task#: 003 State:CObrado Permitfjob #:M-199&103 <br />Date: 06'1]2003 County :Elbert AbbreNation :none <br />User: JOf Site :PafryS Prt Filename:M103-007 <br />Permit or other jab action :Final Redamai <br />Task tl¢SCrIDtiOn : m06/dBAlpb <br />Cost tlala source <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loatling lime (hours) _ <br />UnloaOing time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />Total non-roatlable mob/tlemob wst -: E705.27 <br />'tw mun0 ufps wen beta M <br />Total roatlable mob/tlengb wst-': EDOp <br />'-ore muM ND. ro tool rip <br />Total job time: 3.53 hours <br />ToWI job cost : 3705 <br />Nearest rrejor dty or town within project area region : Lmpn <br />Transportation CVde Time: Non- Total one-way travel Distance: 6.0 miles <br />Roatlable Roatlable Average travel SpeeD: 15.0 mph <br />