My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00466
DRMS
>
Back File Migration
>
Revision
>
REV00466
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:08 AM
Creation date
11/21/2007 8:46:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990093
IBM Index Class Name
Revision
Doc Date
10/3/2001
Doc Name
HIGH FLUME GRAVEL PIT PN M-1990-093 CONVERSION 1 APPROVAL
From
DMG
To
SOUTHWEST LAND SERVICES INC
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />III IIIIIIIII1111Ii1?F <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />13 i 3 Sherman SL. Room 215 <br />Denver, Colorado 00203 <br />Phone: (303) 866-3567 <br />FAX: 1303)832-8106 <br />October 2, 2001 <br />Mr. Kirk Allen <br />Southwest Land Services, <br />P. O. Box 2673 <br />Durango, Colorado 81302 <br />~~~~®~~ <br />Q°~, OOT~3?o <br />InC. ~44ige~e~ O~ <br />c~i_ . <br />LQJiOOV <br />COLORADO <br />DIVISION OF <br />MINERALS <br />CCq//~'~ GEOLOGY <br />ae1 4W B'rIV~ RECLAMATION <br />g. ~~~8~ Fl~~ COPY, MINING•SAFETY <br />~Kg; " 1 ~~ ~ ~ Q Bill Owens <br />~~~ ~V~11 r~ Governor <br />~} I Greg E. Walther <br />l G -~J Executive Dueclor <br />M¢hael B. long <br />Division D~retlor <br />RE: High Flume Gravel Pit, Permit No. M-1990-093, Conversion No. 1 Approval <br />Dear Mr. Allen: <br />On October 1, 2001, the Division of Minerals and Geology approved High Flume Gravel, Int.'s <br />application for Conversion No. 1 (CN-01) to Permit No. M-1990-093 for the High Flume Gravel Pit. The <br />conversion addresses increasing the permit from a 9.8 acre 110c to a 43.06 acre 112c permit and <br />addresses the increased reclamation costs associated with that change. The provisions of CN-01 are <br />hereby considered to be a binding part of Permit No. M-1990-093. All other conditions of the permit <br />remain in full force and effect. <br />The reclamation cost estimate for this operation was recalculated to update the unit costs and to <br />incorporate the provisions of CN-01. A copy of the estimate is enclosed. A financial warranty in the <br />amount of $72,645.00 must be received AND APPROVED by DMG no later than December 3, 2001. <br />Therefore, the warranty will need to be submitted at least two weeks prior to this date, <br />If you need additional information, please contact me at the Division of Minerals and Geology, Grand <br />Junction Field Office, 101 South Third Street, Room 301, Grand Junction, Colorado 81501, telephone <br />no. 970-243-6368. <br />Sincerely, <br />~~~ <br />Steve S. Shuey <br />Environmental Protecti ecialist <br />enclosure <br />cc: Dale Trenkle -High Flume Gravel, Inc. - w/enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.