Laserfiche WebLink
Table MR-184-1. Demonstration of adequacy of current bond to cover proposed <br />mine plan changes. <br />Disturbance 2002 Disturbance <br />Location Acreage Change' <br />Flintlock Pit +15.0 <br />Gatling Pit +12.1 <br />Scoria Pit -25.1 <br />Haulroads -61.7 <br />Total -59.7 <br />Net Decrease = 59.7 Acres <br /> Lineal Feet of O en Pit <br />Open Pit Proposed Lineal Feet Actual Lineal Feet Average Cost <br />Location of Open Pit*' of Open Pit Cost/LF*** Difference <br />Ashmore Pit - - $269 $0 <br />East Ashmore Pit - 2,280 $269 $613,320 <br />Derringer Pit 4,240 4,300 $269 $16,140 <br />Enfield Pit 3,800 - $269 -$1,022,200 <br />East Flintlock Pit 2,990 1,080 $269 -$513,790 <br />Flintlock Pit 5,200 5,180 $269 -$5,380 <br />Gatling Pit 4,280 5,800 $269 $408,880 <br />Tota! 20,510 18,640 -$503,030 <br /> Net Decrease = 1,870 Lineal Feet and $503,030. <br />'Refer to M-9 and M-10 maps. <br />"Taken from Table 1.4-14, permit term vrorst case disturbance (2002). <br />'''Total $ for regrading pits ($5,513,191 from Table 1.4-2) divided by total lineal feet as reflected in <br />the curtent bond (20,5101ineal feet from Table 1.4-14). <br />