Laserfiche WebLink
a'" r <br />• \ • • <br />Mr. Mike Savage <br />Colorado Mined Land Reclamation Division <br />Page 2 <br />the flight and mapping, our new topos and cross sections should be available in <br />October or November. With adequate time for checking the final product for <br />error and adding our own work and calculations to the cross sections, we will be <br />able to submit the swell factor verification in January, 1984, concurrent with <br />the first submission of our annual post-mining topographic maps. <br />If you have any questions concerning the above or require further explana- <br />tion, please feel free to contact either Ed Johnson or me. <br />Sincerely, <br />Larry ,~ohns <br />Senior Engineer <br />Trapper Mine <br />LJ/js <br />Enclosures <br />cc: G. M. Stubblefield <br />E. C. Johnson <br />W. E. Sowards <br />